BLD02-00227
| BLD-Framing/Rough-in | 3/20/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 14:58:38. Contact: . No approved plans or truss package on site at time of inspection. 3/22/2002 9:27:23 AM
|
BLD02-00049
| BLD-Energy code compliance | 3/21/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 11:12:45. Contact: ###-####.
|
BLD02-00052
| BLD-Energy code compliance | 3/21/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 11:13:37. Contact: ###-####.
|
BLD02-00223
| BLD-Framing/Rough-in | 3/21/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | A | FAIL |
|
|
fr gary ###-#### c/n posted--do not insulate-air seal package not done 3/22/2002 9:01:32 AM
|
MEC02-00713
| Rough-in | 3/21/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 15:56:28. Contact: ###-####. Pressure test failed 3/22/2002 9:26:18 AM
|
MEC02-00713
| Pressure Test | 3/21/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 15:57:04. Contact: ###-####. Only 12 lbs on guage at time of inspection. 3/22/2002 9:26:52 AM
|
BLD02-00103
| BLD-Energy code compliance | 3/21/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 17:35:33. Contact: ###-####. ok to cover 3/22/2002 8:42:35 AM
|
BLD02-00108
| BLD-Energy code compliance | 3/22/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 08:06:52. Contact: . ok to cover 3/22/2002 2:35:47 PM
|
BLD02-00223
| BLD-Framing/Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | P | PASS |
|
|
gary- ###-#### fr Ok to insulate 3/22/2002 2:46:26 PM
|
BLD01-03119
| BLD-Footing | 3/22/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | P | PART |
|
|
###-#### CHRIS wip 3/22/2002 2:19:47 PM
|
BLD02-00167
| BLD-Framing/Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | P | PART |
|
|
fire wall LON ###-#### Fire wall on 1st floor-draftstop and fireblocking verified with 1" air space per plans 3/22/2002 12:52:18 PM
|
BLD02-00227
| BLD-Framing/Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | P | PART |
|
|
###-#### KAREN c/n-ok to insulate 3/22/2002 2:06:57 PM
|
BLD02-00326
| BLD-Framing/Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 12:00:00 AM | P | PASS |
|
|
###-#### call first please ok to cover 3/22/2002 1:44:06 PM
|