ESC09-00355
| General Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 3:58:19 PM | P | PASS |
|
|
looked ok
|
ESC09-00720
| General Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 3:57:27 PM | P | CANC |
|
|
looked ok
|
ELE10-00136
| Electrical Rough-In | 3/22/2010 | 3/22/2010 | 3/22/2010 3:56:50 PM | P | PASS |
|
|
ryker Phone #: ###-#### ok to cover concrete encased raceway near building, north side, ok to cover 2 u/g trenches nw of building
|
ESC09-00786
| General Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 3:40:42 PM | P | PASS |
|
|
looked ok
|
ESC10-00028
| General Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 3:25:06 PM | P | PASS |
|
|
looked ok
|
ELE10-00569
| Rough-In Permanent Service | 3/22/2010 | 3/22/2010 | 3/22/2010 3:01:25 PM | P | CANC |
|
|
Inspection requested from web by: Emmet Bushman Phone #: ###-#### see ri and p/s
|
ELE10-00569
| Permanent Service | 3/22/2010 | 3/22/2010 | 3/22/2010 3:01:07 PM | P | PASS |
|
|
Inspection requested from web by: Emmet Bushman Phone #: ###-#### p/s u/g n ok
|
ELE10-00569
| Electrical Rough-In | 3/22/2010 | 3/22/2010 | 3/22/2010 2:22:01 PM | P | FAIL |
|
|
Inspection requested from web by: Emmet Bushman Phone #: ###-#### called, left correction notice, NEC 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, 334.23 cable in attic shall comply with 320.23, BCC shall provide all boxes and make-up, NOTE: corrections shall be made within 5 working days
|
ELE09-02386
| Final | 3/21/2010 | 3/22/2010 | 3/22/2010 1:47:54 PM | P | FAIL |
|
|
Need final inspection for residence. General Contractor will be on site, building will be open. Call with any questions. Thanks Kurt Carlson Inspection requested from web by: Kurt Carlson Phone #: ###-#### called, left correction notice NEC 422.31(B) shall provide breaker lockout for dishwasher, exhaust hood, 410.16(C) shall provide 6" clearance from edge of fixture to edge of shelf in bedroom closet, rest ok, pole light done
|
ELE10-00567
| Temporary Service | 3/22/2010 | 3/22/2010 | 3/22/2010 12:46:43 PM | P | PASS |
|
|
Corrections have been made. Inspection requested from web by: Rhonda Yoast Phone #: ###-#### corrections made, t/s o/h n ok, no esc this project
|
ELE10-00393
| Permanent Service | 3/22/2010 | 3/22/2010 | 3/22/2010 12:03:44 PM | P | PASS |
|
|
bill Phone #: ###-#### p/s u/g n ok
|
ELE07-01945
| Final | 3/18/2010 | 3/22/2010 | 3/22/2010 10:37:14 AM | A | PASS |
|
|
Paul ###-#### ok to final, no esc
|
ELE10-00187
| Final | 3/19/2010 | 3/22/2010 | 3/22/2010 9:54:09 AM | A | PASS |
|
|
Contractor will provide access in the back door Inspection requested from web by: Lloyd Looney Phone #: ###-#### ok to final, no esc
|
ELE10-00404
| Electrical Rough-In | 3/19/2010 | 3/22/2010 | 3/22/2010 9:37:18 AM | A | PASS |
|
|
kenny Phone #: ###-#### ric ok, no esc, called, said to add 1 room to permit
|
ELE10-00567
| Temporary Service | 3/19/2010 | 3/22/2010 | 3/22/2010 9:01:02 AM | A | FAIL |
|
|
Inspection requested from web by: Rhonda Yoast Phone #: ###-#### called, left correction notice, NEC 110.12(B) there shall be no broken parts, 406.8(B) 15 & 20 A receptacles in wet locations shall be listed weather resistant type
|
ELE10-00521
| Electrical Rough-In | 3/19/2010 | 3/22/2010 | 3/22/2010 8:27:32 AM | A | FAIL |
|
|
ug conduit Inspection requested from web by: Lee VanSchoiack Phone #: ###-#### called, left correction notice, NEC 352.26 there shall not be over 360 degree total bend in pvc, 680.10 minimum burial depth shall be 18" within 5' of pool, NOTE: corrections shall be made within 5 working days or further action will be taken
|