FIR09-00486
| INSP-Supply line flush | 3/22/2010 | 3/22/2010 | 3/22/2010 5:13:59 PM | P | PART |
|
|
UG fire supply line flush completed acceptable.
|
BLD09-00776
| FIRE-Final Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 5:11:38 PM | P | PASS |
|
|
Correction notice item field verified for completion, inspection passed.
|
FIR09-00486
| INSP-Sprinkler Rough-in/Hydro | 3/18/2010 | 3/22/2010 | 3/22/2010 5:09:52 PM | A | PART |
|
|
Underground fire supply line hydrostatic test passed.
|
FIR10-00109
| INSP-Final Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 1:33:12 PM | P | PASS |
|
|
Hood suppression system operated correctly under test conditions, permit final approved.
|
BLD09-01423
| FIRE-Final Inspection | 3/19/2010 | 3/22/2010 | 3/22/2010 1:31:51 PM | A | FAIL |
|
|
Correction items have been completed with the exception of duct smoke detection equipment test and approval at one new unit.
|
BLD10-00500
| FIRE-Final Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 11:41:09 AM | P | PASS |
|
|
Correction item verified at second inspection, life safety passed.
|
BLD10-00500
| FIRE-Final Inspection | 3/18/2010 | 3/22/2010 | 3/22/2010 11:39:15 AM | A | FAIL |
|
|
Missing one PFE at the second level mezzanine- need to provide certification tag and post as discussed.
|