Inspections for the day of: Monday, March 22, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01423 FIRE-Final Inspection3/22/20103/22/20103/22/2010 3:32:42 PMPPART
A temporary occupancy was given until the duct smoke detector is tested and operation is verified.
FIR10-00106 INSP-Final Inspection3/22/20103/22/20103/22/2010 3:31:50 PMPFAIL
Chris Farnsworth could not make the inspection when I was there. Has been rescheduled for tomorrow morning.
FIR10-00116 INSP-Sprinkler Rough-in3/22/20103/22/20103/22/2010 2:32:41 PMPPASS
Sprinkler piping is ok to cover.
BLD10-00498 FIRE-Final Inspection3/19/20103/22/20103/22/2010 11:30:02 AMAPASS
Life safety passed.
FIR10-00032 INSP-Sprinkler Rough-in3/19/20103/22/20103/22/2010 10:36:09 AMAPASS
The phase 1 sprinkler piping, as marked and dated on the plans, is ok to cover.