Inspections for the day of: Monday, March 22, 2010.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01018 DOC - Permit Finaled3/22/20103/22/20103/22/2010 3:58:21 PMPPASS
ESC07-01026 DOC - Permit Finaled3/22/20103/22/20103/22/2010 3:58:13 PMPPASS
ESC09-00150 General Inspection2/22/20103/22/20103/22/2010 2:38:27 PMAPASS
A hydro-seed application has implemented on the disturbed area next to the Settlers Canal. will re-inspect in 2 months for a "Site Final" if vegitatiion has been achieved.
ESC09-00203 BMP Violation3/22/20103/22/20103/22/2010 2:21:42 PMPFAIL
Verbal to RP:
Install a sediment barrier along the south end of project area where disturbed lot is elevated higher than the parking lot. Also install a stabilized construction access onto the disturbed area in the south end of project area. Will re-inspect on 3/26/10 for a confrence.
ESC05-01635 Aging Inspection3/22/20103/22/20103/22/2010 1:44:26 PM DONE
ESC05-01635 DOC - Permit Finaled3/22/20103/22/20103/22/2010 1:44:20 PMPPASS
ESC05-01954 Aging Inspection3/22/20103/22/20103/22/2010 1:38:07 PM DONE
ESC05-01954 DOC - Permit Finaled3/22/20103/22/20103/22/2010 1:37:50 PMPPASS
ESC05-01913 Aging Inspection3/22/20103/22/20103/22/2010 11:13:58 AM DONE
ESC05-01913 DOC - Permit Finaled3/22/20103/22/20103/22/2010 11:13:40 AMPPASS
ESC05-01838 Aging Inspection3/22/20103/22/20103/22/2010 10:52:38 AM DONE
ESC05-01838 DOC - Permit Finaled3/22/20103/22/20103/22/2010 10:52:28 AMPPASS
ESC10-00217 Site Preparation3/22/20103/22/20103/22/2010 9:42:22 AM PASS
nOT REQUIRING THE STORM DRAIN TO BE PROTECTED DUE TO THE SCOPE OF WORK.
ESC08-00480 General Inspection3/22/20103/22/20103/22/2010 9:10:39 AM DONE
ESC08-00480 DOC - Permit Finaled3/22/20103/22/20103/22/2010 9:10:23 AMPPASS
ESC10-00220 Site Preparation3/22/20103/22/20103/22/2010 8:55:52 AM PASS
ESC10-00218 Site Preparation3/22/20103/22/20103/22/2010 8:44:56 AM NR
Work has not begun due to weather.
ESC10-00153 Site Preparation3/22/20103/22/20103/22/2010 8:44:33 AM PART
Verbal to RP:
Post ESC sign at the front of project where is visable from the street. Also prior to any concrete pour, provide a concrete washout pit. Will re-inspect on 3/26/10.
ESC10-00152 Site Preparation3/22/20103/22/20103/22/2010 8:44:03 AM PART
Verbal to RP:
Post ESC sign at the front of project where is visable from the street. Also prior to any concrete pour, provide a concrete washout pit. Will re-inspect on 3/26/10.
ESC08-00491 Site Final1/6/20103/22/20103/22/2010 6:07:51 AMACANC