Inspections for the day of: Tuesday, March 22, 2011.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 General Inspection3/22/20113/22/20113/22/2011 1:57:11 PMPPART
Need mainyenance on BMP's on lower end of Wellings Creek new section below the G.Belt Ped. Bridge. Wattle halt covered with water at discharge, (remove), silt curtain not anchored. Important to initiate stabilization on bare ground both sides of channel. Left message for Gary H. RP.
ESC10-00600 General Inspection3/22/20113/22/20113/22/2011 9:22:02 AMAPART
Verbal to Contractor, RP; Provide a sediment barrier on south side of rip rap and extend a barrier on the north side, (Boise City Side of the river). As soil moisture lessens trackwalk and then spray per SWPPP, tack, seed & mulch. Install RECB and reminded contractor to verify stapling pattern to be followed by manufacture. Also, install blanket with toe in up hill and overlap as required.