FIR10-00429
| FIR-Aging Inspection | 3/22/2011 | 3/22/2011 | 3/29/2011 2:36:13 PM | | NR |
|
|
Per Brian with SImplex Charlie is working on getting the elevators done.
|
FIR10-00469
| FIR-Aging Inspection | 3/22/2011 | 3/22/2011 | 3/28/2011 10:31:28 AM | | NR |
|
|
John is following up on permit status.
|
FIR11-00073
| INSP-Sprinkler Rough-in | 3/22/2011 | 3/22/2011 | 3/22/2011 3:40:29 PM | P | PASS |
|
|
The overhead hydro test for the spray booth piping passed. The return bends have been installed. Awaiting the resubmittals.
|
BLD10-02906
| FIRE-Final Inspection | 3/22/2011 | 3/22/2011 | 3/22/2011 3:20:48 PM | P | PASS |
|
|
Life safety passed. Building inspector please verify the two new double doors when installed.
|
BLD10-02855
| FIRE-Conference | 3/18/2011 | 3/22/2011 | 3/22/2011 2:50:41 PM | P | DONE |
|
|
Met Plans Examiner Carl Madsen and Building Inspector Jim Sly on site at 1:30 pm. I went over 1994 UFC fire alarm requirements with Rand as well.
|
FIR10-00514
| INSP-Sprinkler Rough-in | 3/18/2011 | 3/22/2011 | 3/22/2011 11:38:46 AM | A | PASS |
|
|
The sprinkler piping on the second floor is ok to cover except at the new lobby area.
|
FIR10-00470
| INSP-Sprinkler Rough-in | 3/18/2011 | 3/22/2011 | 3/22/2011 10:57:14 AM | A | PASS |
|
|
The Showroom area sprinkler piping is ok to cover. The pendant sprinkler heads have not been installed in the same locations shown on the approved plans but mathmatically the coverage appears to still be adequate.
|
FIR11-00073
| INSP-Sprinkler Rough-in/Hydro | 3/21/2011 | 3/22/2011 | 3/22/2011 10:54:46 AM | A | FAIL |
|
|
Plans do not match installation. Addtional heads have been added to the new piping and the sprinkler system layout does not match the city approved plans. Plans and calculations will need to be resubmitted for review. The two north most pendant heads need to be installed on return bends per NFPA 13 7.2.2 (3). No hydro test was performed due to piping modifications being required.
|