Inspections for the day of: Friday, March 22, 2013.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-00609 FIRE-Final Inspection3/21/20133/22/20133/22/2013 5:55:46 PMAFAIL
Correction items include; door hardware, open junction box, repair handrail at stairs, plans indicate exit signs are required.
FIR12-00147 INSP-Sprinkler Rough-in/Hydro3/19/20133/22/20133/22/2013 5:50:39 PMADEFR
Brian will be on site call prior to arrival Phone #: ###-#### >> Inspection requested via web by Sam Ball
FIR13-00121 INSP-Final Inspection3/21/20133/22/20133/22/2013 5:50:04 PMANH
No access to complete inspection.
FIR12-00146 INSP-Final Inspection3/20/20133/22/20133/22/2013 5:48:58 PMPPART
Refer to plan review comments items #12 and plan modification comments #23 and 24 regarding adjustments to be made. New HD's at the truck bays okayed.
FIR13-00091 INSP-Sprinkler Rough-in3/22/20133/22/20133/22/2013 5:36:50 PMPPART
Okay to cover overhead fire sprinkler work at the grid ceilings.
FIR13-00057 INSP-Sprinkler Rough-in3/22/20133/22/20133/22/2013 5:18:28 PMAPART
Okay to cover sheetrock lids and cloud ceiling areas in "phase one" as noted on approved plans.
BLD12-02884 FIRE-Final Inspection3/21/20133/22/20133/22/2013 5:11:12 PMAPASS
Fire life safety inspection passed.
FIR13-00131 INSP-Final Inspection3/21/20133/22/20133/22/2013 8:44:11 AMACANC
Stefan is the contact. THanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus