Inspections for the day of: Friday, March 22, 2013.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00215 Site Preparation3/22/20133/22/20133/25/2013 2:58:54 PM PART
Due to work at the access , there will not be a stabilized construction access installed at this time due to utility work. Contractor (Tuffy Ecavation will sweep up any tracked material on a daily basis. If the disturbed soil becomes staturated, there will be no traffic on and off of the project area.
ESC13-00161 Site Preparation3/22/20133/22/20133/25/2013 2:34:55 PM PART
ESC13-00195 Site Preparation3/22/20133/22/20133/25/2013 2:20:52 PM PASS
ESC12-00860 General Inspection3/22/20133/22/20133/25/2013 2:12:31 PM PASS
ESC13-00053 Site Preparation3/22/20133/22/20133/25/2013 2:11:38 PM PASS
ESC12-00831 Aging Inspection3/22/20133/22/20133/22/2013 8:34:06 AM DONE
Permit finaled.
ESC12-00831 DOC - Permit Finaled3/22/20133/22/20133/22/2013 8:33:51 AMPPASS
ESC12-01128 General Inspection3/22/20133/22/20133/22/2013 8:12:58 AM PASS