PLM16-03131
| PLM-Aging Inspection | 3/22/2017 | 3/22/2017 | 3/28/2017 11:12:22 AM | | PEND |
|
|
waiting on proper permits
|
PLM17-00780
| Final | 3/21/2017 | 3/22/2017 | 3/22/2017 4:18:14 PM | P | PASS |
|
|
Redo gas pressure test after 2 pm with a 30 precall. Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
PLM17-00834
| Sprinkler (Final) | 3/21/2017 | 3/22/2017 | 3/22/2017 3:56:05 PM | P | PASS |
|
|
Final sprinkler inspection ready. Thank you! Phone #: ###-#### Inspection requested via web by debbie long
|
PLM17-00054
| Plumbing Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 3:38:55 PM | P | PART |
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. In-wall dwv and water.
|
PLM17-00849
| Water Heater Final | 3/22/2017 | 3/22/2017 | 3/22/2017 3:08:58 PM | P | PASS |
|
|
Would like late PM and call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria
|
PLM17-00845
| Groundwork | 3/22/2017 | 3/22/2017 | 3/22/2017 2:58:17 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by david colburn
|
PLM17-00359
| Plumbing Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 2:44:39 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kristy Watson. 1. provide nail protection at all pipes. 2. Remove the concrete from around the unprotected pe water service. 3. Test t/s valves
|
PLM17-00360
| Plumbing Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 2:38:05 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kristy Watson. Provide protection at pipes, water and dwv. Remove concrete from around unprotected PE water service piping. Test t/s valves.
|
PLM17-00597
| Plumbing Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 2:21:29 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. gw passed
|
PLM17-00597
| Groundwork | 3/22/2017 | 3/22/2017 | 3/22/2017 2:21:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM17-00280
| Final | 3/22/2017 | 3/22/2017 | 3/22/2017 2:05:46 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers. Provide water heater protection in the garage. 508.14
|
PLM17-00828
| Water Heater Final | 3/21/2017 | 3/22/2017 | 3/22/2017 1:44:48 PM | P | PASS |
|
|
Call plumber when in route to assure job is completed. Installation is scheduled for AM. Robert Resue ###-#### Phone #: ###-#### Inspection requested via web by Erin Whiting
|
PLM17-00197
| Final | 3/22/2017 | 3/22/2017 | 3/22/2017 1:24:24 PM | P | PASS |
|
|
Inspection requested via web by Brian Johansen
|
PLM17-00196
| Final | 3/22/2017 | 3/22/2017 | 3/22/2017 1:24:06 PM | P | PASS |
|
|
Inspection requested via web by Brian Johansen
|
PLM17-00793
| Water Heater Final | 3/17/2017 | 3/22/2017 | 3/22/2017 10:35:11 AM | A | PASS |
|
|
PLEASE CALL TERIE AT ABOVE NUMBER WHEN HEADED OUT Phone #: ###-#### Inspection requested via web by Nick Drake
|
PLM16-03148
| PLM-Aging Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 10:28:52 AM | | PEND |
|
|
talked to ho. wip
|
PLM17-00790
| Final | 3/17/2017 | 3/22/2017 | 3/22/2017 9:58:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Hensley
|
PLM16-02078
| PLM-Aging Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 9:35:06 AM | | PASS |
|
|
|
PLM16-02078
| DOC - Permit Finaled | 3/22/2017 | 3/22/2017 | 3/22/2017 9:34:50 AM | P | PASS |
|
|
|
PLM17-00815
| Final | 3/21/2017 | 3/22/2017 | 3/22/2017 9:33:15 AM | A | PASS |
|
|
This is for space #19. Jose Gallegos ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM16-04511
| Final | 3/21/2017 | 3/22/2017 | 3/22/2017 9:21:19 AM | A | PASS |
|
|
garage door code 3355 Phone #: ###-#### Inspection requested via web by john richmond
|
PLM17-00840
| Water and/or Sewer | 3/21/2017 | 3/22/2017 | 3/22/2017 9:03:27 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Darren Wood. Water meter not set. Call after final connection
|
PLM17-00840
| Final | 3/22/2017 | 3/22/2017 | 3/22/2017 9:02:30 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Darren Wood
|
PLM17-00121
| Final | 3/21/2017 | 3/22/2017 | 3/22/2017 8:51:02 AM | A | PASS |
|
|
Home owner or other contractors should be on site. Please call me if they arent. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
PLM17-00709
| Groundwork | 3/21/2017 | 3/22/2017 | 3/22/2017 8:38:37 AM | A | PASS |
|
|
if questions call Chad @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM17-00780
| Final | 3/21/2017 | 3/22/2017 | 3/21/2017 2:57:23 PM | P | CANC |
|
|
Please go back and redo the gas pressure test. Please give customer a 30 min precall Phone #: ###-#### >> Inspection requested via web by Andrea Grigsby Inspection cancelled from web by: Andrea Grigsby
|