LIP00-00028
| Child Care Renewal | 4/18/2016 | 3/18/2017 | | | |
|
|
|
FIR17-00012
| INSP-Sprinkler Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 1:34:12 PM | P | PASS |
|
|
Sprinkler rough-in passed. Tenting is not complete so no piping can be covered.
|
BLD16-04524
| FIRE-Final Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 1:33:37 PM | P | PASS |
|
|
Life safety passed. Per conversation with Greg the project super the tenant will be changing the suite number from 260 to 200 in the future. I let him know that they will need to contact addressing for guidance.
|
BLD17-00347
| FIRE-Final Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 10:15:19 AM | P | PASS |
|
|
life safety passed
|