FIR17-00001
| INSP-Sprinkler Rough-in/Hydro | 3/22/2017 | 3/22/2017 | 3/22/2017 3:46:46 PM | P | PASS |
|
|
Underground hydrostatic test complete
|
FIR16-00760
| INSP-Sprinkler Rough-in/Hydro | 3/22/2017 | 3/22/2017 | 3/22/2017 3:46:21 PM | P | PASS |
|
|
Underground hydrostatic test complete
|
FIR17-00130
| INSP-Sprinkler Rough-in/Hydro | 3/22/2017 | 3/22/2017 | 3/22/2017 3:45:58 PM | P | PASS |
|
|
Underground hydrostatic test complete
|
FIR17-00001
| INSP-Supply line flush | 3/21/2017 | 3/22/2017 | 3/22/2017 2:48:52 PM | P | CANC |
|
|
Incorrect inspection request, request is for an underground hydro, this request cancelled and the correct request generated.
|
FIR16-00760
| INSP-Supply line flush | 3/21/2017 | 3/22/2017 | 3/22/2017 2:48:31 PM | P | CANC |
|
|
Incorrect inspection request, request is for an underground hydro, this request cancelled and the correct request generated.
|
FIR17-00130
| INSP-Supply line flush | 3/21/2017 | 3/22/2017 | 3/22/2017 2:48:12 PM | P | CANC |
|
|
Incorrect inspection request, request is for an underground hydro, this request cancelled and the correct request generated.
|
FIR16-00512
| INSP-Sprinkler Rough-in/Hydro | 3/21/2017 | 3/22/2017 | 3/22/2017 2:45:06 PM | P | PART |
|
|
Hydrostatic test for overhead fire sprinkler piping complete for levels 2, 3 and 4, level one did not pass hydrostatic test, visible leak on the overhead fire sprinkler piping as well as pressure loss at gauge. Rough to cover inspection complete for levels 1 and 2, levels 1 and 2 approved for cover. Rough in inspection complete for levels 3 and 4, partial cover allowed on level 3, fire sprinkler piping located in attic space cannot be covered until tenting inspection is complete, overhead fire sprinkler piping in attic space cannot be covered until tenting inspection is complete.
|
BLD13-03142
| BLD-Final | 3/22/2017 | 3/22/2017 | 3/22/2017 2:37:58 PM | P | PASS |
|
|
As per Building Official, racking system has been approved. Final life fire safety inspection passed/complete.
|
FIR16-00101
| INSP-Sprinkler Rough-in/Hydro | 3/21/2017 | 3/22/2017 | 3/22/2017 1:28:54 PM | A | PASS |
|
|
Rough to cover inspection for level 1 complete, approved for cover. Hydrostatic test for overhead fire sprinkler piping on level 1 complete.
|
BLD15-04468
| FIRE-Conference | 3/22/2017 | 3/22/2017 | 3/22/2017 1:27:57 PM | P | CANC |
|
|
Conference rescheduled for 23MAR2017
|
BLD17-00613
| FIRE-Final Inspection | 3/16/2017 | 3/22/2017 | 3/22/2017 10:46:40 AM | A | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Noted that front entry has thumbturn deadbolt (Door signage is in place) as well as round type door hardware. Rear exit door has flush mount slide bolt that was removed during inspection, rear exit has round type door hardware as well. Final life fire safety inspection passed/complete.
|