Inspections for the day of: Wednesday, March 22, 2017.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00857 General Inspection3/22/20173/22/20173/28/2017 5:10:23 PM CANC
ESC16-01550 General Inspection3/9/20173/22/20173/23/2017 9:47:40 AMPPASS
ESC17-00231 Conference3/21/20173/22/20173/22/2017 4:05:44 PMACANC
meet with IPC
ESC16-00650 Aging Inspection3/22/20173/22/20173/22/2017 3:48:40 PM DONE
Project complete, all permits finaled. No ESC requests/corrections.
ESC16-00650 DOC - Permit Finaled3/22/20173/22/20173/22/2017 3:45:48 PMPPASS
ESC15-01483 General Inspection3/22/20173/22/20173/22/2017 3:27:48 PM PASS
Project near completion. Structure is complete, WIP on exterior finish and site development. MS4 inlets have sediment bag protection. No trackout or discharges from site. Trash and materials contained. No corrections.
ESC17-00250 Site Preparation3/17/20173/22/20173/22/2017 3:26:38 PMPPASS
Onsite meeting with RP Leland and project manager Adrian.

Permit sign now posted on SWPPP sign at staging area. Staging area is fenced in and will house equipment, concrete washout, and trash facility. Trees have already been removed. Using Julia Davis Park central path as long stabilized entrance. Will plan on having sweeping unit available for any trackout or dust issues occuring.

Park vegetataion surrounding construction area to be preserved. Two storm drain inlets in front zoo have filter bag protection installed.

Approved for construction.
ESC15-00453 General Inspection3/22/20173/22/20173/22/2017 11:02:08 AM PEND