BLD99-03310
| FIRE-Conference | 3/22/2000 | 3/23/2000 | 3/23/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/22/2000 at 11:59:40. Contact: ###-####. When to have sprinkler R/I 3/27/00 9:56:57 AM
|
FIR99-00533
| INSP-Final Inspection | 3/22/2000 | 3/23/2000 | 3/23/2000 12:00:00 AM | A | FAIL |
|
|
greg ###-#### fn --200 lb test Not final inspection.\ 3/27/00 9:56:47 AM
|
BLD99-01291
| FIRE-Final Inspection | 3/22/2000 | 3/23/2000 | 3/23/2000 12:00:00 AM | P | PART |
|
|
###-#### Rod Need assembly permit 3/24/00 1:08:35 PM
|
BLD99-02183
| FIRE-Final Inspection | 3/22/2000 | 3/23/2000 | 3/23/2000 12:00:00 AM | P | PASS |
|
|
###-#### Rod
|
BLD00-00235
| FIRE-Final Inspection | 3/23/2000 | 3/23/2000 | 3/23/2000 12:00:00 AM | P | PART |
|
|
HE SAID YOU COULD DO THIS AT 1:30 // ###-#### Need assembly permit 3/24/00 1:08:48 PM
|
BLD00-00177
| FIRE-Final Inspection | 3/23/2000 | 3/23/2000 | 3/23/2000 12:00:00 AM | P | PASS |
|
|
Gail Ward ###-####
|
BLD99-03682
| FIRE-Final Inspection | 3/23/2000 | 3/23/2000 | 3/22/2000 12:00:00 AM | P | PASS |
|
|
|
BLD99-02327
| FIRE-Conference | 3/23/2000 | 3/23/2000 | 3/22/2000 12:00:00 AM | P | PART |
|
|
discussed alarm plans - wil change 15/75/ cd strobes to 110. will use lower ma rating strobes and will provide adjusted battery calcs.
|