Inspections for the day of: Friday, March 23, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02887 BLD-Energy code compliance3/22/20013/23/20013/23/2001 12:00:00 AMAPASS
PJ sMith ###-####
BLD01-00571 BLD-Footing3/22/20013/23/20013/23/2001 12:00:00 AMAPART
###-####
BLD00-03108 BLD-Final3/22/20013/23/20013/23/2001 12:00:00 AMAPASS
###-#### C/C issued. 3/23/2001 12:44:35 PM
BLD01-00420 BLD-Energy code compliance3/22/20013/23/20013/23/2001 12:00:00 AMAPASS
###-####
BLD01-00550 BLD-Foundation3/22/20013/23/20013/23/2001 12:00:00 AMAPART
###-#### Bsmnt walls OK. 3/23/2001 10:56:26 AM
BLD01-00310 BLD-Framing/Rough-in3/22/20013/23/20013/23/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/22/2001 at 10:16:08. Contact: ###-####.
MEC01-00631 Rough-in3/23/20013/23/20013/23/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/23/2001 at 07:55:22. Contact: ###-####. C/N on site....called contr. 3/23/2001 3:33:02 PM
MEC01-00631 Pressure Test3/23/20013/23/20013/23/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/23/2001 at 07:55:41. Contact: ###-####.
MEC01-00660 Pressure Test3/23/20013/23/20013/23/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/23/2001 at 08:12:17. Contact: ###-####.
BLD01-00032 BLD-Footing3/23/20013/23/20013/23/2001 12:00:00 AMPPART
###-#### Footing at N. and E. wall....Pending special insp and appr. 3/23/2001 2:14:14 PM
BLD01-00466 BLD-Framing/Rough-in3/23/20013/23/20013/23/2001 12:00:00 AMPFAIL
jp --###-#### C/N...Truss bracing. 3/23/2001 3:58:47 PM