PLM01-00810
| Water and/or Sewer | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | FAIL |
|
|
Marie ###-####
|
PLM01-00810
| Water and/or Sewer | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | FAIL |
|
|
Marie ###-#### clean out required on the waste line, hang waste line every 4', hang water service piping every 32", 2 hose clamps required at all poly joints, drivers rolled 180 degrees apart, insert barbed adaptors all the way. 3/23/2001 9:05:37 AM
|
PLM01-00433
| Groundwork | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 08:30:58. Contact: ###-####.
|
PLM01-00362
| Final | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 08:35:37. Contact: ###-####. set equipment, test rp, temp occ ok 3/23/2001 3:00:16 PM
|