Inspections for the day of: Friday, March 23, 2001.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-00810 Water and/or Sewer3/22/20013/23/20013/23/2001 12:00:00 AMAFAIL
Marie ###-####
PLM01-00810 Water and/or Sewer3/22/20013/23/20013/23/2001 12:00:00 AMAFAIL
Marie ###-#### clean out required on the waste line, hang waste line every 4', hang water service piping every 32", 2 hose clamps required at all poly joints, drivers rolled 180 degrees apart, insert barbed adaptors all the way. 3/23/2001 9:05:37 AM
PLM01-00433 Groundwork3/23/20013/23/20013/23/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/23/2001 at 08:30:58. Contact: ###-####.
PLM01-00362 Final3/23/20013/23/20013/23/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/23/2001 at 08:35:37. Contact: ###-####. set equipment, test rp, temp occ ok 3/23/2001 3:00:16 PM