BLD01-00521
| BLD-Framing/Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PART |
|
|
###-####; add framing anchors at joists over window well at rim; seal/fireblock. ok to insul 3/23/2001 10:32:16 AM
|
BLD00-02891
| BLD-Framing/Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | FAIL |
|
|
Contact Dennis @ ###-#### for access.; c/n, re- support or dbl. "header" joists, fix plbg underfloor, make other trade insps (elec c/n...hvac, plbg???) 3/23/2001 11:14:03 AM
|
BLD00-01750
| BLD-Final | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PART |
|
|
IF YOU GO BEFORE 11:00 CALL ###-####; need plbg finalled, struct ok... 3/23/2001 11:29:27 AM
|
BLD00-03519
| BLD-Footing | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 17:39:34. Contact: ###-####. col's; requested eng'r observe & report re p.t. deck, & overall for concrete (as designed ) deck is also 3hr occ sep. 3/23/2001 9:42:47 AM
|
BLD00-03538
| BLD-Footing | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/23/2001 8:27:07 AM north slope shot-creted to prevent sluff...ok non struct. per supt. WIP on north ftgs, mti onsite
|
BLD00-02910
| BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/23/2001 9:28:28 AM response to inquiry : insul face paper should be removed,check w/ fire safety re sprinkler placement; area sep. wall to be upgraded per Jason B...grid clg, too.
|
BLD00-03337
| BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/23/2001 9:57:28 AM w/ supt: complete c/n, add trim at ext as req'd for weatherproof ext, smooth landing at rear door, etc.
|
MIS00-00136
| BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/23/2001 10:40:29 AM w GS & 301; Storey made initial insp...questions re exiting, door at stair enclosure, access controll devices, prop mgr to recall.
|
BLD00-03697
| BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/23/2001 11:31:22 AM w/ Terry of sundance const; need complete detail for 1hr rated closure of entry area, consult arch...seal elec penetrations at existing shaft
|
BLD00-02743
| BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/23/2001 11:40:51 AM w/ Dave L re shaft...cover exposed edges at top w/ gyp...
|
BLD00-00758
| BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/23/2001 11:41:43 AM w/ R2H eng's....Robert; keep c/n, need report.
|
BLD00-00616
| BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/23/2001 12:22:30 PM plans lost...ok
|
BLD00-02587
| BLD-Framing/Rough-in | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | FAIL |
|
|
###-#### call 1/2 hour prior to meet there , c/n, clarify shear at int & east side,ok to insul 3/23/2001 5:27:36 PM
|
BLD01-00191
| BLD-Framing/Rough-in | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | PART |
|
|
CEILING\\###-####; need elec prior to tiles, c/n issued, tie all lights, diffusers, chk at final 3/23/2001 2:42:37 PM
|
BLD00-03126
| BLD-Framing/Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | PART |
|
|
CEILING\\###-####\\BEFORE 2:00 OR AFTER 3:30
|