BLD00-03126
| FIRE-Sprinkler Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
###-#### okay to cover 3/23/2001 10:37:03 AM
|
BLD00-03265
| FIRE-Final Inspection | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-01941
| FIRE-Final Inspection | 3/22/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
FIR01-00086
| INSP-Sprinkler Rough-in/Hydro | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 3/23/2001 10:36:31 AM
|
BLD01-00051
| FIRE-Final Inspection | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | FAIL |
|
|
###-#### exit signs on north side no working 3/23/2001 2:56:54 PM
|
BLD00-03707
| FIRE-Final Inspection | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | FAIL |
|
|
###-#### need exit sign for accessible exit from assembly room and completion of hallway 101 to assembly room 3/23/2001 2:56:10 PM
|
BLD00-03676
| FIRE-Final Inspection | 3/23/2001 | 3/23/2001 | 3/23/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 10:08:41. Contact: . conference only - detectors required to shut down AHU's in this space; exit sign not working; they won't have the exterior exit complete during this phase 3/23/2001 2:03:32 PM
|