Inspections for the day of: Friday, March 23, 2007.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03054 FIRE-Final Inspection3/23/20073/23/20073/23/2007 2:17:39 PMPFAIL
No inspection performed since there is a hold due to unpaid alarm contractor permit fees.
FIR06-00723 INSP-Final Inspection3/22/20073/23/20073/23/2007 2:15:48 PMPFAIL
No duct smoke detectors have been tested because the heat would not come on. Also after I called the monitoring company to verify signals I found the monitoring company got zones where as according to the alarm technition the panel should be reporting in points. Per the fire sprinkler contractor this system was never pretested. It appears that I need to start the test over since this has been awaste of time.
BLD06-02615 FIRE-Final Inspection3/23/20073/23/20073/23/2007 2:12:55 PMPPART
A temporary occupancy was given with dave hannimans permission until items as noted by mike timmermans inspection have been corrected for the fire alarm and suppression permits. Also the battery containment issues needs addressed.
FIR06-01000 INSP-Alarm Testing3/22/20073/23/20073/23/2007 2:04:20 PMAPART
A temporary occupancy was given with dave hannimans permission until items as noted by mike timmermans inspection have been corrected.
FIR06-00777 INSP-Final Inspection3/23/20073/23/20073/23/2007 1:51:10 PMPFAIL
I stopped the inspection after just looking at the east tenant. In the upstairs office areas there are two upright heads on the north side of the ducting that have not been installed, two uprights have been painted and one 2'-5" armover has no hanger
BLD07-00316 FIRE-Final Inspection3/22/20073/23/20073/23/2007 11:06:03 AMAPASS
life safety passed.
FIR05-00536 INSP-Sprinkler Rough-in3/22/20073/23/20073/23/2007 11:01:51 AMAPASS
See the city approved plans for first floor and fifth floor areas where the piping is ok to cover
FIR07-00232 INSP-Sprinkler Rough-in3/22/20073/23/20073/23/2007 10:23:37 AMAPASS
The inbuilding riser and 10' of stubout pipe is ok to cover.
BLD07-00295 FIRE-Final Inspection3/23/20073/23/20073/23/2007 10:11:50 AMPPASS
life safety passed
FIR07-00177 INSP-Sprinkler Rough-in/Hydro3/22/20073/23/20073/23/2007 8:20:09 AMAPASS
permit finaled
BLD07-00203 FIRE-Final Inspection3/22/20073/23/20073/23/2007 7:30:54 AMAPASS
Life safety passed
FIR07-00132 INSP-Sprinkler Rough-in3/22/20073/23/20073/22/2007 9:20:50 AMACANC
Inspection cancelled from web by: John Warnick