ESC09-00035
| Conference | 3/9/2009 | 3/23/2009 | 3/23/2009 3:27:49 PM | P | PASS |
|
|
2:30pm: Reviewed site with Strata, (Brightons consultant) and C. Smith. Reminder that site stabilization is a federal requirement.upon completion of activities, including de-watering basin and channels.
|
ESC07-01438
| BMP Violation | 3/20/2009 | 3/23/2009 | 3/23/2009 10:52:43 AM | A | PART |
|
|
Follow up: Inserts in place, rock entrance in place. Verbal to RP that additional rock is needed prior to forecasted rain from ashalt to start of existing rock, appr. 8 feet, if not this low area will become very muddy and cause trackout issues. Will follow up
|
ESC08-00183
| General Inspection | 3/23/2009 | 3/23/2009 | 3/23/2009 10:21:08 AM | A | PART |
|
|
Site looks good, verbal to Habitat that sediment barrier around irrigation drops are in need of better securing to post. Tom Wood-###-#### will make the necessary maintanence today. Also talked to Dennis ###-####.
|