Inspections for the day of: Monday, March 23, 2009.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00831 INSP-Sprinkler Rough-in3/23/20093/23/20093/23/2009 4:13:51 PMPPASS
The rough-in for the third floor sprinkler piping passed. This includes the supply piping that is located on the second floor and the rise ups to the third floor. I found one piece of pipe that has been installed the wrong size and its location has been noted on the plans.
FIR09-00159 INSP-Sprinkler Rough-in/Hydro3/23/20093/23/20093/23/2009 4:11:38 PMPPASS
The underground hydro passed.
FIR09-00027 INSP-Sprinkler Rough-in3/23/20093/23/20093/23/2009 2:49:00 PMPPASS
The thrust block at the 45 has been replaced and the remaining underground piping can be covered.
FIR09-00160 INSP-Sprinkler Rough-in/Hydro3/20/20093/23/20093/23/2009 11:29:50 AMACANC
The wrong inspection number was called in.
FIR08-00831 INSP-Sprinkler Rough-in/Hydro3/19/20093/23/20093/23/2009 9:41:07 AMAPASS
The sprinkler piping rough-in for the first floor residential rooms of building "B" is passed. I noted one pendant head in the far south east corner resident room is overspaced. A second inspection will be required prior to a cover approval for the installation of the insulation.