FIR08-00831
| INSP-Sprinkler Rough-in | 3/23/2009 | 3/23/2009 | 3/23/2009 4:13:51 PM | P | PASS |
|
|
The rough-in for the third floor sprinkler piping passed. This includes the supply piping that is located on the second floor and the rise ups to the third floor. I found one piece of pipe that has been installed the wrong size and its location has been noted on the plans.
|
FIR09-00159
| INSP-Sprinkler Rough-in/Hydro | 3/23/2009 | 3/23/2009 | 3/23/2009 4:11:38 PM | P | PASS |
|
|
The underground hydro passed.
|
FIR09-00027
| INSP-Sprinkler Rough-in | 3/23/2009 | 3/23/2009 | 3/23/2009 2:49:00 PM | P | PASS |
|
|
The thrust block at the 45 has been replaced and the remaining underground piping can be covered.
|
FIR09-00160
| INSP-Sprinkler Rough-in/Hydro | 3/20/2009 | 3/23/2009 | 3/23/2009 11:29:50 AM | A | CANC |
|
|
The wrong inspection number was called in.
|
FIR08-00831
| INSP-Sprinkler Rough-in/Hydro | 3/19/2009 | 3/23/2009 | 3/23/2009 9:41:07 AM | A | PASS |
|
|
The sprinkler piping rough-in for the first floor residential rooms of building "B" is passed. I noted one pendant head in the far south east corner resident room is overspaced. A second inspection will be required prior to a cover approval for the installation of the insulation.
|