PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, March 23, 2009
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC08-00178
Random Inspection
3/23/2009
3/23/2009
3/23/2009 3:53:44 PM
P
PASS
ESC09-00035
Conference
3/9/2009
3/23/2009
3/23/2009 2:51:33 PM
P
DONE
Meeting canceled. Site looks good. Still active though. Minor de watering occuring within the trenched area. Discussed with the consultant who is incharge of inspections over stabilization of all disturbed soils.
ESC08-00924
BMP Violation
3/19/2009
3/23/2009
3/23/2009 1:52:27 PM
P
PASS
ESC09-00121
Site Preparation ESC
3/23/2009
3/23/2009
3/23/2009 1:52:18 PM
NR
Work will not begin until between May and July of 2009. I will be notified by the RP for the start date.
ESC08-00412
General Inspection
3/23/2009
3/23/2009
3/23/2009 11:11:06 AM
DONE
Moved to a site final.
ESC08-00412
Site Final
3/23/2009
3/23/2009
3/23/2009 11:09:59 AM
A
PASS
ESC08-00467
General Inspection
3/23/2009
3/23/2009
3/23/2009 10:36:47 AM
PASS
Vegitation is starting to come through the s-2 blanket. Soon theye will have achived final stabilization.
ESC08-00732
BMP Violation
3/20/2009
3/23/2009
3/23/2009 9:49:49 AM
A
PASS
ESC09-00123
Site Preparation
3/23/2009
3/23/2009
3/23/2009 9:38:15 AM
NR
ESC09-00105
Site Preparation
3/23/2009
3/23/2009
3/23/2009 9:23:33 AM
PART
Verbal to RP:
Provide a trash debris container.
ESC09-00064
General Inspection
3/19/2009
3/23/2009
3/23/2009 9:00:12 AM
A
FAIL
Verbal to RP(Last Verbal, Will issue a stop work order if not corrected.)
1. Protect disturbed area along trenched stock pile berms with a sediment barrier.
2. Maintain D.I. protection.
Will re-inspect on 3/24/09 AM
ESC08-00634
Tracking Control
3/20/2009
3/23/2009
3/23/2009 8:41:28 AM
P
PASS
ESC07-00987
General Inspection
3/20/2009
3/23/2009
3/23/2009 8:31:35 AM
A
PASS