FIR05-00439
| INSP-Conference | 3/23/2010 | 3/23/2010 | 3/29/2010 3:20:16 PM | P | DONE |
|
|
Field insp. scheduled 3/30
|
BLD09-00521
| FIRE-Conference | 3/23/2010 | 3/23/2010 | 3/23/2010 4:34:42 PM | P | DONE |
|
|
Regarding fire lane access signage, fire extinguishers per review comments, etc.
|
FIR10-00042
| INSP-Final Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 4:33:11 PM | P | CANC |
|
|
Jim Phone #: ###-#### Inspection to be rescheduled per conversation with contractor.
|
FIR09-00726
| FIR-Aging Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 4:32:20 PM | | DONE |
|
|
In progress, discussed scheduling for on site acceptance testing.
|
BLD09-00055
| FIRE-Final Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 4:30:47 PM | P | PASS |
|
|
Vanilla shell permit okayed for final. Discussed items necessary for code compliance related to the pending permit application to establish a certificate of occupancy for the new tenant-.
|
FIR10-00115
| INSP-Final Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 4:27:01 PM | P | PASS |
|
|
Fire alarm work passed field testing, network module summary recieved per plan review request, permit finaled.
|
BLD09-02291
| FIRE-Final Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 4:24:05 PM | A | PART |
|
|
Final pending fire alarm permit work for relays at the main entry/exit door mag locks to release upon alarm per IFC requirements.
|
BLD09-01971
| FIRE-Conference | 3/22/2010 | 3/23/2010 | 3/23/2010 4:21:40 PM | A | DONE |
|
|
Regarding signage and spill containment per review notes- proposed corrections by contractor appear satisfactory.
|
FIR10-00075
| INSP-Sprinkler Rough-in | 3/23/2010 | 3/23/2010 | 3/23/2010 4:19:09 PM | A | PART |
|
|
UG okayed for bury, discussed flush and hydro testing schedules.
|
FIR10-00100
| INSP-Sprinkler Rough-in/Hydro | 3/22/2010 | 3/23/2010 | 3/23/2010 4:18:10 PM | A | PASS |
|
|
Underground fire supply line hydrostatic test passed.
|