Inspections for the day of: Wednesday, March 23, 2011.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00470 INSP-Sprinkler Rough-in3/23/20113/23/20113/23/2011 3:02:04 PMPPASS
The under mezzanine sprinkler piping, showroom side of wall, is ok to cover.
FIR10-00579 FIR-Aging Inspection3/23/20113/23/20113/23/2011 2:40:20 PMPCANC
wrong inspection type set up.
FIR10-00579 INSP-Sprinkler Rough-in3/23/20113/23/20113/23/2011 2:37:19 PMPPASS
The lighting obstructions have been addressed and the extended coverage head is ok. Items needing addressed are the typical final inspection items such as tagging, signage, backflow certification and forward flow test.....ect
FIR10-00443 INSP-Final Inspection3/22/20113/23/20113/23/2011 2:23:41 PMPFAIL
Provide the missing earthquake bracing at the east end of the system and change the lateral bracing to a longitudinal brace at the 2 1/2" connection point per the plans. Also many of the new sidewall heads exceed 6" down from the deck. Per the detail on the plans the heads are to be installed at 6". There was no data sheet provided to verify if the heads could be up to 10" below the deck as some are installed now.
FIR11-00118 INSP-Final Inspection3/23/20113/23/20113/23/2011 1:48:57 PMPPASS
Permit finaled
BLD11-00435 FIRE-Final Inspection3/22/20113/23/20113/23/2011 10:23:53 AMAPASS
life safety passed