PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, March 23, 2011
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC10-00815
Random Inspection
3/23/2011
3/23/2011
3/23/2011 4:24:52 PM
P
PART
Verbal to RP:
Contact the city and update the contact phone number.
ESC10-00547
Random Inspection
3/23/2011
3/23/2011
3/23/2011 2:08:14 PM
P
PART
Verbal to RP;
Clean up all hard surfaces of alll sediment and debris as best as possible. Also beware of any turbid runoff from the disturbed soil into the storm drains. If discharging occurs and is turbid, a sediment barrier will be required to be installed.
ESC05-01525
Aging Inspection
3/23/2011
3/23/2011
3/23/2011 1:58:03 PM
DONE
Permit Finalled.
ESC05-01525
DOC - Permit Finaled
3/23/2011
3/23/2011
3/23/2011 1:57:41 PM
P
PASS
ESC05-01576
Aging Inspection
3/23/2011
3/23/2011
3/23/2011 1:13:12 PM
DONE
Permit finalled.
ESC05-01576
DOC - Permit Finaled
3/23/2011
3/23/2011
3/23/2011 1:12:05 PM
P
PASS
ESC11-00102
BMP Violation
3/23/2011
3/23/2011
3/23/2011 9:43:00 AM
A
FAIL
Verbal to RP:
Install ALL storm drain inlet protection per the manufactures specifiations. Will re-inspect on 3/24/2011AM.
ESC11-00009
BMP Violation
3/21/2011
3/23/2011
3/23/2011 9:33:52 AM
A
PASS
ESC10-00010
General Inspection
3/23/2011
3/23/2011
3/23/2011 9:16:35 AM
PART
The stabilized construction enntrance must be extended to the asphalt once work occurs again.
ESC11-00117
General Inspection
3/22/2011
3/23/2011
3/23/2011 9:15:28 AM
A
PART
Verbal to Jeff Snyder and RP:
Re-post ESC sign at front of project area. Install or reinstall a sediment barrier per manufactures specifications at the end of Windsong at the edge of the asphalt. clean up all foot tracking at the end of each work day. Also recommended to update the SWPPP to show the installation of all BMP's being used at this time with it being dated by the qualifed person at the time of installation. Will re-inspect on 3/24/2011AM.
ESC09-00755
DOC - Permit Finaled
3/23/2011
3/23/2011
3/23/2011 7:43:38 AM
P
PASS