BLD14-01694
| BLD-Foundation | 3/20/2015 | 3/23/2015 | 3/23/2015 4:54:03 PM | P | PASS |
|
|
Wes Phone #: ###-####
|
BLD15-00604
| BLD-Final | 3/23/2015 | 3/23/2015 | 3/23/2015 4:53:34 PM | P | PASS |
|
|
Sean Phone #: ###-####
|
BLD15-00604
| DOC - Permit Finaled | 3/23/2015 | 3/23/2015 | 3/23/2015 4:53:12 PM | P | PASS |
|
|
|
BLD15-00497
| BLD-Foundation | 3/20/2015 | 3/23/2015 | 3/23/2015 4:24:37 PM | P | PASS |
|
|
Shawn-would like insp at 2:00-i told contractor to call inspector Phone #: ###-####
|
BLD15-00525
| BLD-Footing | 3/20/2015 | 3/23/2015 | 3/23/2015 2:45:50 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-00103
| BLD-Framing/Rough-in | 3/23/2015 | 3/23/2015 | 3/23/2015 2:45:18 PM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD14-03698
| BLD-Energy code compliance | 3/23/2015 | 3/23/2015 | 3/23/2015 2:44:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bryan Millar
|
BLD14-01731
| BLD-Conference | 3/23/2015 | 3/23/2015 | 3/23/2015 2:40:07 PM | P | DONE |
|
|
Aaron Phone #: ###-#### Inspection of Convevtional framed roof ......to include rafters and ridge board. OK. OK to sheet rafters ......install 2x6 sleepers above sheeting, install spray foam between sleepers and install final roof sheeting above sleepers. Any Electrical installed where foam insulation is installed .....will be inspected prior to cover. Have not inspected Engineered steel rafter ties.
|
BLD15-00143
| BLD-Framing/Rough-in | 3/19/2015 | 3/23/2015 | 3/23/2015 12:21:13 PM | A | PASS |
|
|
TJ Phone #: ###-####
|
BLD15-00433
| BLD-Framing/Rough-in | 3/20/2015 | 3/23/2015 | 3/23/2015 12:20:42 PM | A | PART |
|
|
Tim Phone #: ###-#### OK when Electr R/I inspection completed left note. Frame OK
|
BLD15-00213
| BLD-Wall Bracing | 3/22/2015 | 3/23/2015 | 3/23/2015 11:48:11 AM | A | PART |
|
|
Phone #: 2088180141 >> Inspection requested via mobile web by Matt Exterior nailing only.....OK.
|