BLD13-00166
| BLD-Conference | 3/10/2015 | 3/16/2015 | | A | |
|
|
|
BLD13-03582
| BLD-Energy code compliance | 3/23/2015 | 3/23/2015 | 3/23/2015 3:40:08 PM | P | PASS |
|
|
Rob Phone #: ###-####. rigid insulation at interior side of stemwall under SOG
|
BLD13-03584
| BLD-Energy code compliance | 3/23/2015 | 3/23/2015 | 3/23/2015 3:38:35 PM | P | PASS |
|
|
Rob Phone #: ###-####. rigid insulation at interior side of stemwall under SOG
|
BLD15-00175
| BLD-Wall Bracing | 3/23/2015 | 3/23/2015 | 3/23/2015 3:07:17 PM | P | PASS |
|
|
Inspection for shear nailing first floor. Would like to cover with house wrap if it''s good. Phone #: ###-#### Inspection requested via web by Paul Thompson
|
BLD14-02972
| BLD-Final | 3/23/2015 | 3/23/2015 | 3/23/2015 2:22:45 PM | P | PART |
|
|
Rocko Phone #: ###-####. ok for temp. occ. Will be ok for perm occ. once the racking permit has been issued.
|
BLD15-00220
| BLD-Final | 3/23/2015 | 3/23/2015 | 3/23/2015 2:20:54 PM | P | PASS |
|
|
Rocko Phone #: ###-####. Ok for perm occ.
|
BLD13-03601
| BLD-Footing | 3/23/2015 | 3/23/2015 | 3/23/2015 2:19:38 PM | P | PASS |
|
|
Manuel Phone #: ###-####
|
BLD13-03600
| BLD-Footing | 3/23/2015 | 3/23/2015 | 3/23/2015 2:18:31 PM | P | PASS |
|
|
Manuel Phone #: ###-####
|
BLD14-03400
| BLD-Final | 3/19/2015 | 3/23/2015 | 3/23/2015 10:04:36 AM | A | CANC |
|
|
Chris @ ###-####. this has been rescheduled for the 30th.
|
BLD15-00333
| BLD-Conference | 3/23/2015 | 3/23/2015 | 3/23/2015 9:47:31 AM | A | DONE |
|
|
Park on the North side and call me. I''ll come out and get you. Phone #: ###-#### Inspection requested via web by Bob Thornton.
|
BLD14-02504
| BLD-Final | 3/20/2015 | 3/23/2015 | 3/23/2015 9:08:34 AM | A | PASS |
|
|
Curtis Phone #: ###-####
|
BLD14-02504
| DOC - Permit Finaled | 3/23/2015 | 3/23/2015 | 3/23/2015 9:08:22 AM | P | PASS |
|
|
All issues have been resolved.
|