ESC14-00212 General Inspection3/23/20153/23/20153/23/2015 4:41:54 PM PASS
ESC14-00759 General Inspection3/23/20153/23/20153/23/2015 4:10:05 PM CANC
rescheduled
ESC14-00944 Random Inspection3/23/20153/23/20153/23/2015 3:31:01 PMPPASS
WIP on interior and exterior finishes. Home foundation and frame are complete. No trackout or sediment runoff from site. Permit is posted with contact details.

Approved.
ESC14-00684 General Inspection3/23/20153/23/20153/23/2015 3:29:52 PM PASS
Home construction is complete. Landscaping in progress. Disturbed hillside areas around site perimeter have been hydroseeded.

Rill erosion caused previously has been regraded and rooftop storm drains are now connected to the subdivision stormwater stub-system.
ESC13-00690 Aging Inspection3/23/20153/23/20153/23/2015 3:19:34 PM PEND
No new work has occured since order to provide valid grading plans and permit approval. Downslope silt fence has been repaired and hillside tracked horizontally to slow runoff.

No requests at this time. SWO still posted.
ESC13-00764 Aging Inspection3/23/20153/23/20153/23/2015 3:09:27 PM PASS
2 SFHs with seperate permits in progress on Bent Bow with Eerie Canyon #7. Drop inlets have inlet protection. Hillsides that were seeded last year are stabilized and no hillside erosion is occuring.

No corrections required at this time.

ESC14-00711 General Inspection3/23/20153/23/20153/23/2015 2:30:34 PM PASS
Construction complete and home is ready to be occupied. Site is not yet vegetated/landscaped as mentioned previously and is on a hillside. A bond for hillside stabilization and drainage has been issued.

Will keep ESC permit open till stabilization accomplished. Currently the rooftop storm drain outlet will discharge to bare ground on the hillside so could cause rill erosion if not landscaped soon. No sediment leaving site currently.
ESC14-00371 General Inspection3/23/20153/23/20153/23/2015 2:07:17 PM PASS
Project complete. New bus lane and drop area is constructed as well as the oil and sand trap for stormwater treatment. Materials removed and parking area swept clean. Approved.
ESC14-00371 DOC - Permit Finaled3/23/20153/23/20153/23/2015 2:06:16 PMPPASS
ESC12-00206 Aging Inspection3/23/20153/23/20153/23/2015 1:38:50 PM PASS
Frazier Place sub is fully developed with about 4-5 open parcels remaining. Storm drains have inlet protection on Preece and end of Frazier, materials and supplies are kept in storage container. Trash is contained, no trackout or sediment entering roadway and gutters. 2 SFHs in progress at this time. No corrections needed.
ESC14-01048 General Inspection3/23/20153/23/20153/23/2015 12:07:17 PMPPASS
Broadway retail site has has had the 7 SFHs demolished and materials removed from site. The disturbed areas have been hydroseeded and permit/SWPPP box are still onsite. There is a stockpile stabilized at north end of site. Wattle is also installed along the north property border. Entire block fenced in and K2 sign up.

New Popeye's is proposed in this spot and will need to submit ESC plan amendments to show new BMPs required if wanting to work under this permit.

No issues at sitw -will keep open until new phases begin.
ESC14-00094 General Inspection3/23/20153/23/20153/23/2015 11:50:48 AM PASS
Cancer Pavillion project is in progress. No construction occuring at time of inspection. Cement pad has been poured next to the pond. Wattles and construction fencing protect the area and the edge of pond rock structures are undisturbed. Water level is currently below building area and sandbags are in place.

Permit is posted. No violations observed.
ESC13-01028 Aging Inspection3/23/20153/23/20153/23/2015 11:20:52 AM PASS
WIP. Last section of Tahoe Homes on Old Hickory is in progress. No runoff from work area, spills, or loose sediment in gutter. Alley way is clean and receiving DIs have inlet protection. 2###-#### should be done soon and landscaped as a block.
ESC14-00181 Site Final3/23/20153/23/20153/23/2015 10:27:08 AMAPART
Construction complete and sidewalk street have been swept.

1627 has been finaled. Need to clear materials (wattles, concrete chunks) from adjacent lot to close out permit.

No runoff or issues at site.
ESC14-00278 Aging Inspection3/23/20153/23/20153/23/2015 10:25:00 AM PASS
Construction complete. Yard is prepped for installation of landscaping/lawn by future homeowner. Top soil level is below sidewalks/curbs and cannot runoff site. Construction materials cleaned and removed.

Permit for adjacent townhome ESC14-00181 will remain open until materials are removed from vacant lot to north of home.
ESC14-00278 DOC - Permit Finaled3/23/20153/23/20153/23/2015 10:21:07 AMPPASS
ESC14-00239 Random Inspection3/23/20153/23/20153/23/2015 9:52:37 AMPPART
WIP. No significant trackout observed, no discharges or spill in or around site and gutters are relatively clean.

1 correction:
Do maintenance on all storm drain drop inlets. In particular the inlet on Dale and Island needs to be fitted with an alternative BMP because of its irregular shape.
ESC12-00130 General Inspection3/23/20153/23/20153/23/2015 9:39:06 AM PASS
No trackout from site. Silt fence perimeter installed. No discharge from site. Permit posted by construction entrance.
ESC13-01231 General Inspection3/23/20153/23/20153/23/2015 9:02:06 AM PASS
WIP on interior of units. Exterior is not yet stabilized but BMPs include perimeter wattle and inlet protection protection on MS4. Permit posted on fence by construction entrance.

No corrections at this time.
ESC13-00930 General Inspection3/23/20153/23/20153/23/2015 8:36:41 AM PASS
Permit posted at gate. No trackout or discharges from site. Work is occuring within walled compound. Pool construction also in progress under ESC14-00752 and is near completion.