BLD15-01845
| BLD-Aging Inspection | 3/23/2016 | 3/23/2016 | 3/28/2016 6:47:35 AM | | PEND |
|
|
|
BLD15-00849
| BLD-Framing/Rough-in | 3/23/2016 | 3/23/2016 | 3/25/2016 6:19:28 AM | P | PEND |
|
|
Brian Phone #: ###-#### needs other trades rough ins fire stopping around fire places soffits around plumbing in garage fix eve framing
|
BLD14-02173
| BLD-Energy code compliance | 3/22/2016 | 3/23/2016 | 3/24/2016 12:21:57 PM | A | PASS |
|
|
Insulation // John Phone #: ###-#### stack 2-3 floor 5 slab edge fire safing and floor 4 insulation ok
|
BLD15-04509
| BLD-Framing/Rough-in | 3/23/2016 | 3/23/2016 | 3/24/2016 7:16:08 AM | P | PEND |
|
|
Pat Phone #: ###-#### framing ok but need to know how we are going to vent roof ok to insulate
|
BLD16-00483
| BLD-Framing/Rough-in | 3/22/2016 | 3/23/2016 | 3/24/2016 7:13:38 AM | A | NR |
|
|
Carlos Phone #: ###-#### needs elec mec and plumbing rough ins frist also needs to install steel beam and conceret peir pad for point load
|
BLD15-03620
| BLD-Foundation | 3/23/2016 | 3/23/2016 | 3/23/2016 3:41:08 PM | P | PASS |
|
|
Gatti Phone #: ###-####
|
BLD16-00862
| BLD-Final | 3/16/2016 | 3/23/2016 | 3/23/2016 1:28:28 PM | P | PASS |
|
|
roofing final Phone #: ###-#### Inspection requested via web by Craig Frame
|
BLD16-00862
| DOC - Permit Finaled | 3/23/2016 | 3/23/2016 | 3/23/2016 1:28:14 PM | P | PASS |
|
|
|
BLD16-00881
| BLD-Footing | 3/23/2016 | 3/23/2016 | 3/23/2016 1:19:11 PM | P | PASS |
|
|
Bill Phone #: ###-####
|
BLD15-04291
| BLD-Final | 3/22/2016 | 3/23/2016 | 3/23/2016 9:11:16 AM | A | PASS |
|
|
Mark Phone #: ###-####
|
BLD15-04291
| DOC - Permit Finaled | 3/23/2016 | 3/23/2016 | 3/23/2016 9:11:05 AM | P | PASS |
|
|
|
BLD14-03207
| BLD-Conference | 3/21/2016 | 3/23/2016 | 3/23/2016 6:30:23 AM | P | PART |
|
|
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|