Inspections for the day of: Wednesday, March 23, 2016.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-01845 BLD-Aging Inspection3/23/20163/23/20163/28/2016 6:47:35 AM PEND
BLD15-00849 BLD-Framing/Rough-in3/23/20163/23/20163/25/2016 6:19:28 AMPPEND
Brian Phone #: ###-#### needs other trades rough ins fire stopping around fire places soffits around plumbing in garage fix eve framing
BLD14-02173 BLD-Energy code compliance3/22/20163/23/20163/24/2016 12:21:57 PMAPASS
Insulation // John Phone #: ###-#### stack 2-3 floor 5 slab edge fire safing and floor 4 insulation ok
BLD15-04509 BLD-Framing/Rough-in3/23/20163/23/20163/24/2016 7:16:08 AMPPEND
Pat Phone #: ###-#### framing ok but need to know how we are going to vent roof ok to insulate
BLD16-00483 BLD-Framing/Rough-in3/22/20163/23/20163/24/2016 7:13:38 AMANR
Carlos Phone #: ###-#### needs elec mec and plumbing rough ins frist also needs to install steel beam and conceret peir pad for point load
BLD15-03620 BLD-Foundation3/23/20163/23/20163/23/2016 3:41:08 PMPPASS
Gatti Phone #: ###-####
BLD16-00862 BLD-Final3/16/20163/23/20163/23/2016 1:28:28 PMPPASS
roofing final Phone #: ###-#### Inspection requested via web by Craig Frame
BLD16-00862 DOC - Permit Finaled3/23/20163/23/20163/23/2016 1:28:14 PMPPASS
BLD16-00881 BLD-Footing3/23/20163/23/20163/23/2016 1:19:11 PMPPASS
Bill Phone #: ###-####
BLD15-04291 BLD-Final3/22/20163/23/20163/23/2016 9:11:16 AMAPASS
Mark Phone #: ###-####
BLD15-04291 DOC - Permit Finaled3/23/20163/23/20163/23/2016 9:11:05 AMPPASS
BLD14-03207 BLD-Conference3/21/20163/23/20163/23/2016 6:30:23 AMPPART
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson