FIR15-00822
| INSP-Supply line flush | 3/21/2016 | 3/23/2016 | 3/23/2016 2:10:34 PM | P | PASS |
|
|
Underground flush passed.
|
BLD16-00559
| FIRE-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 2:09:59 PM | P | FAIL |
|
|
Provide city approved plans and notes, provide verification of column protection per NFPA 13 16.1.4
|
FIR16-00182
| INSP-Final Inspection | 3/23/2016 | 3/23/2016 | 3/23/2016 12:22:03 PM | P | PASS |
|
|
permit finaled
|
BLD15-04485
| FIRE-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 9:56:37 AM | A | FAIL |
|
|
Provide address numbers as discussed, provide ADA hardware per the door schedule, provide additional fire extinguisher in the basement.
|
BLD16-00642
| FIRE-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 8:49:35 AM | A | PASS |
|
|
Life safety passed. Owner to provide ADA hardware on the main exit and restroom doors, remove thumbturns on main doors and provide sticker prior to a building inspection as agreed.
|
BLD16-00697
| FIRE-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 8:49:15 AM | A | PASS |
|
|
Life safety passed. Owner to provide ADA hardware on the main exit and restroom doors, remove thumbturns on main doors and provide sticker prior to a building inspection as agreed.
|
BLD16-00829
| FIRE-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 8:35:17 AM | A | PASS |
|
|
life safety passed
|
BLD15-01780
| FIRE-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 7:37:09 AM | A | PART |
|
|
A temporary occupancy is being given with Romeo's permission until the LP dispencer has been reviewed/approved by the Fire Dept. All other corrections have been addressed.
|