BLD15-04264
| BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | | P | |
|
|
Jeff Phone #: ###-####
|
BLD16-00246
| BLD-Wall cover | 3/22/2016 | 3/23/2016 | 3/23/2016 3:37:32 PM | P | FAIL |
|
|
Shear // Matt Phone #: ###-####. Shear wall type #3 in back missed. Per engineering and city approved plans All shear walls, bearing walls (interior and exterior require full height blocking between trussus. Also provide staple conversion from your engineer. Correction notice posted.
|
BLD16-00246
| BLD-Framing/Rough-in | 3/22/2016 | 3/23/2016 | 3/23/2016 3:36:35 PM | P | FAIL |
|
|
Matt Phone #: ###-####. Shear wall type #3 in back missed. Per engineering and city approved plans All shear walls, bearing walls (interior and exterior require full height blocking between trussus. Also provide staple conversion from your engineer. Correction notice posted.
|
BLD16-00860
| BLD-Final | 3/16/2016 | 3/23/2016 | 3/23/2016 3:10:46 PM | P | DONE |
|
|
roofing final Phone #: ###-#### Inspection requested via web by Craig Frame
|
BLD16-00860
| DOC - Permit Finaled | 3/23/2016 | 3/23/2016 | 3/23/2016 3:10:26 PM | P | PASS |
|
|
|
BLD16-00143
| BLD-Wall Bracing | 3/23/2016 | 3/23/2016 | 3/23/2016 2:05:24 PM | P | PASS |
|
|
Jose Phone #: ###-####
|
BLD15-03338
| BLD-Conference | 3/23/2016 | 3/23/2016 | 3/23/2016 1:45:45 PM | P | PASS |
|
|
David Phone #: ###-####. Went over new ADA ramp. prior to concrete placement.
|
BLD14-03071
| BLD-Conference | 3/23/2016 | 3/23/2016 | 3/23/2016 11:20:29 AM | A | DONE |
|
|
Stop by job site to see job to check job progress. 1st floor has been framed, and working on sheeting the 2nd. floor decking.
|
BLD15-04357
| BLD-Framing/Rough-in | 3/21/2016 | 3/23/2016 | 3/23/2016 10:31:51 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD16-00268
| BLD-Framing/Rough-in | 3/22/2016 | 3/23/2016 | 3/23/2016 9:13:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton. Phase 1 interior steel stud walls and soffit ok.
|