Inspections for the day of: Wednesday, March 23, 2016.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00033 INSP-Sprinkler Rough-in/Hydro3/22/20163/23/20163/23/2016 2:07:57 PMPPASS
Hydrostatic test (200psi for 2 hours) complete for 6th floor. Rough to cover inspection complete for 6th floor, entire area of work on 6th floor approved for cover.
BLD15-03593 FIRE-Final Inspection3/22/20163/23/20163/23/2016 11:18:46 AMAPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD16-00433 FIRE-Final Inspection3/22/20163/23/20163/23/2016 11:17:09 AMAPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers have current inspection tags. Final life fire safety inspection passed/complete
FIR15-00738 INSP-Final Inspection3/22/20163/23/20163/23/2016 11:15:18 AMAPASS
Final fire sprinkler inspection passed/complete
FIR15-00631 INSP-Final Inspection3/23/20163/23/20163/23/2016 11:14:28 AMAPASS
Final fire alarm inspection passed/complete
FIR16-00071 INSP-Sprinkler Rough-in/Hydro3/23/20163/23/20163/23/2016 11:13:19 AMACANC
Inspection request cancelled per conversation with Adam Phone #: ###-####, underground would not hold pressure, underground hydrostatic test will be rescheduled after repair is made.
FIR15-00425 INSP-Final Inspection3/22/20163/23/20163/23/2016 11:10:30 AMAPASS
Final fire sprinkler inspection passed/complete
FIR16-00133 INSP-Sprinkler Rough-in/Hydro3/22/20163/23/20163/23/2016 9:22:11 AMAPASS
Rough to cover inspection complete, area of work approved for cover.
FIR15-00901 INSP-Final Inspection3/22/20163/23/20163/23/2016 8:34:34 AMACANC
Inspection request cancelled, fire sprinkler dry systems are ready for final alarm test.
FIR15-00902 INSP-Final Inspection3/22/20163/23/20163/23/2016 8:33:49 AMACANC
Inspection request cancelled, fire sprinkler dry systems are ready for final alarm test.