Inspections for the day of: Wednesday, March 23, 2016.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00729 Tracking Control3/22/20163/23/20163/24/2016 1:49:39 PMPPEND
active construction in progress at west entrance on Barber so no construction entrance installed currently, sweeper truck was ordered on Tuesday.
Will continue to monitor. No new corrections.
ESC16-00118 BMP Violation3/23/20163/23/20163/24/2016 12:28:55 PMPPEND
Report of stockpiles placed on sidewalk and gutter for Tahoe Homes on Ghost Bar.....

Request to store backfill on a designated staging lot.
ESC15-00414 Aging Inspection3/23/20163/23/20163/24/2016 11:37:28 AM PASS
Home complete. Active SFH construction in East Valley, temp BMPs installed. ESC permit conditions satisfied.
ESC15-00410 Aging Inspection3/23/20163/23/20163/24/2016 11:37:17 AM PASS
Home complete. Active SFH construction in East Valley, temp BMPs installed. ESC permit conditions satisfied.
ESC15-00065 General Inspection3/23/20163/23/20163/23/2016 4:27:27 PM PASS
landscaping in progress
ESC15-00094 General Inspection3/23/20163/23/20163/23/2016 4:27:02 PM PASS
Hillside BMPs and hydroseeding applied last fall are working well to keep sediment on site. No corrections needed at this time. BH#7 to start soon, see ESC16-00225
ESC14-00572 General Inspection3/23/20163/23/20163/23/2016 4:25:25 PM CANC
ESC15-00024 General Inspection3/23/20163/23/20163/23/2016 2:06:21 PM PASS
Home complete and landscaped. DI bag on Candleridge is now removed. No other actions required. ESC permit finaled.
ESC15-00024 DOC - Permit Finaled3/23/20163/23/20163/23/2016 2:02:29 PMPPASS
ESC04-00695 DOC - Permit Finaled3/23/20163/23/20163/23/2016 12:36:41 PMPPASS
old inactive permit in system still open, now closed.
ESC03-00711 DOC - Permit Finaled3/23/20163/23/20163/23/2016 12:36:23 PMPPASS
old inactive permit in system still open, now closed.
ESC03-00912 DOC - Permit Finaled3/23/20163/23/20163/23/2016 12:36:14 PMPPASS
old inactive permit in system still open, now closed.
ESC04-00669 DOC - Permit Finaled3/23/20163/23/20163/23/2016 12:36:01 PMPPASS
old inactive permit in system still open, now closed.
ESC03-00529 DOC - Permit Finaled3/23/20163/23/20163/23/2016 12:35:32 PMPPASS
old inactive permit in system still open, now closed.
ESC15-00908 General Inspection3/23/20163/23/20163/23/2016 12:34:37 PMPPASS
No activity at time of inspection. No trackout. Back of building still is not yet landscaped and some stockpiles remain. No corrections, will check on progress next general inspection and close if work complete. Low risk site, very flat & limited excavation.
ESC15-01353 General Inspection3/23/20163/23/20163/23/2016 12:26:03 PMPPASS
WIP on re-surfacing 2 of the south courts. Permit sign postsed, no trackout or discharges.
ESC15-01012 DOC - Permit Finaled3/23/20163/23/20163/23/2016 11:37:17 AMPPASS
ESC15-01192 DOC - Permit Finaled3/23/20163/23/20163/23/2016 11:10:41 AMPPASS
TI complete. All permits finaled. No ESC issues
ESC03-00166 DOC - Permit Finaled3/23/20163/23/20163/23/2016 11:01:14 AMPPASS
old permit in system; inactive
ESC07-01540 DOC - Permit Finaled3/23/20163/23/20163/23/2016 11:00:26 AMPPASS
old permit in system; inactive
ESC15-01205 DOC - Permit Finaled3/23/20163/23/20163/23/2016 10:59:37 AMAPASS
TI complete. All permits finaled. No ESC issues
ESC15-00597 Aging Inspection3/23/20163/23/20163/23/2016 10:36:11 AM PASS
Permit sign. No exterior activity at time of inspection. Project at same location under review, no need for two ESC permits. No discharges or uncontained material on site.
ESC15-00035 General Inspection3/23/20163/23/20163/23/2016 9:20:06 AM PASS
ESC16-00202 Tracking Control3/22/20163/23/20163/23/2016 8:52:04 AMAPASS
RP-GC is now onsite cleaning up track out and will post yellow ESC.

Suggested DI bag on Kootenai as alternative to the wattle laying in the gutter...