Inspections for the day of: Friday, March 23, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-00729 Rough-in3/23/20183/23/20183/23/2018 4:26:35 PMPFAIL
Phone #: ###-#### Inspection requested via web by Krista Boss
1) remove all insulation required for HVAC inspection
2) insulation shield required on b-vent from second floor floor to above insulation in attic
3) 20# gas test ok
MEC18-00729 Pressure Test3/23/20183/23/20183/23/2018 4:25:05 PMPPASS
Phone #: ###-#### Inspection requested via web by Krista Boss 20# gas test ok
MEC18-01296 Rough-in3/23/20183/23/20183/23/2018 3:57:16 PMPPART
We will cover copper lineset 1st thing this morning. Will by done by 10:00 AM. Condensate will run to floor drain after equipment is set. Thank you, Floyd ###-#### Inspection requested via web by Floyd Floyd Peek
partial ri ok walls and ceiling
MEC18-01284 Final3/23/20183/23/20183/23/2018 3:52:12 PMPNR
Please call Johnny with questions ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala walk through with Mike Jordan, seems they are working outside the scope of their permit.
MEC17-05307 Final3/22/20183/23/20183/23/2018 3:33:18 PMPPASS
Phone #: ###-#### Inspection requested via web by Melissa Skinner
PLM18-01197 Final3/23/20183/23/20183/23/2018 3:32:36 PMPPASS
David Phone #: ###-####
PLM18-01147 Plumbing Rough-in3/23/20183/23/20183/23/2018 1:32:27 PMPPASS
please call for access Phone #: ###-#### Inspection requested via web by Brian Johansen ri ok
MEC18-01276 Rough-in3/23/20183/23/20183/23/2018 1:32:07 PMPFAIL
Inspection requested via web by Aaron Alandt no acca report approved yet flue test failed
PLM18-01189 Final3/23/20183/23/20183/23/2018 11:46:46 AMAPASS
Ste. 700 US Bank Building please call with any questions. Thank you Phone #: ###-#### Inspection requested via web by Kelly King final ok with the dishwasher hose secured to counter top height. I talked to the contractor.
PLM18-00838 Plumbing Rough-in3/22/20183/23/20183/23/2018 11:46:15 AMAPART
Phone #: ###-#### Inspection requested via web by Nicholas Paige ri for two walls in the basement ok
PLM18-00194 Final3/22/20183/23/20183/23/2018 9:59:43 AMAPASS
James Phone #: ###-####
PLM18-00194 Card not on site to sign3/23/20183/23/20183/23/2018 9:59:31 AMPPASS
James Phone #: ###-####
PLM18-01187 Plumbing Rough-in3/22/20183/23/20183/23/2018 9:17:04 AMAPASS
Call right away about meeting someone there // Ken Phone #: ###-#### ri ok
PLM18-01152 Plumbing Rough-in3/22/20183/23/20183/23/2018 8:52:22 AMAPASS
Michael-call 30 mins for access Phone #: ###-####-no building permit ri ok
PLM16-03168 PLM-Aging Inspection3/23/20183/23/20183/23/2018 7:54:56 AM PEND
building inspections look like they are going to finish this project