Inspections for the day of: Monday, March 23, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-04330 Final3/23/20203/23/20203/23/2020 2:19:58 PMPPASS
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...see rough notes...job complete...panels existing...disconnect and meter base replaced
ELE17-04330 Permanent Service3/23/20203/23/20203/23/2020 2:18:53 PMPPASS
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...new 200A meter base installed with 1 new 100A disconnect...meter set and power on...unable to verify wire size...business operational at time of inspection...electrical contractor taking full responsibility for wiring uninspected
ELE19-03967 Electrical Rough-In3/23/20203/23/20203/23/2020 1:49:49 PMPPASS
UG cover. Rigo is the onsite contact. Thanks Phone #: ###-#### Inspection requested via web by Buster Bowen...perimeter building lighting and service feeds...ok to cover
ELE20-00965 Final3/23/20203/23/20203/23/2020 1:31:49 PMPPASS
Ben ###-####...job complete...existing panel made into sub panel-grounds and neutrals seperated...ok to final
ELE20-00788 Electrical Rough-In3/23/20203/23/20203/23/2020 1:06:43 PMPPASS
call for access, switches and wiring are inside by the new back slider door, home owners should be home. I can meet you there if necessary Phone #: ###-#### Inspection requested via web by steve sellers...rough in complete
ELE20-00791 Temporary Service3/23/20203/23/20203/23/2020 12:53:36 PMPPASS
Please feel free to contact Luke ###-#### with questions. Thanks!!
Overhead pole sits between 9835 ; 9853. Phone #: ###-#### Inspection requested via web by Clayton Morgan

t/s o/h new ok
ELE20-01033 Rough-In Permanent Service3/23/20203/23/20203/23/2020 11:19:51 AMPPASS
Phone #: ###-#### Inspection requested via web by Dan Rohl...
rough ok to cover
p/s u/g new ok
ELE20-00234 Final3/23/20203/23/20203/23/2020 11:18:30 AMPPASS
garage 7445 Phone #: ###-#### Inspection requested via web by Dan Rohl...corrections made...ok to final
ELE19-03758 Rough-In Permanent Service3/20/20203/23/20203/23/2020 10:49:31 AMAPASS
rough in for 1st and 2nd floor units
visual for service gear...call Ben to open up...
rough in for 1st floor and 2nd floor units
p/s u/g new ok...17 meters needed
ELE20-00641 Electrical Rough-In3/23/20203/23/20203/23/2020 9:41:29 AMAPASS
permit paid, hoping for 10:00, thanks Phone #: ###-#### Inspection requested via web by Dale Johnson...rough in ok to cover...new kitchen, bathroom, laundry, garage, exterior lighting and receps...bedroom and living rm walls not opened up
ELE19-03525 Electrical Rough-In3/20/20203/23/20203/23/2020 9:09:59 AMAPASS
Ceiling inspection. Please see Steve Nuxoll for locations Phone #: ###-#### Inspection requested via web by JENNY EMEL...2nd floor North and South offices ok to cover
ELE20-00631 Final3/20/20203/23/20203/23/2020 8:11:38 AMAPASS
On Site Contact: Mierins Rozentals. ###-####
Please call ahead to coordinate arrival time, thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting...correction made...ok to final