BLD97-00181
| INSP - Conference | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - RE C/N OF 3-21-97: PLBG OK PER JERRY VARNER
|
BLD97-00228
| INSP - Framing/Rough-in | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | | FAIL |
|
|
/ / 340 - C/N, NEED ELEC, COMPLETE BEAM INSTALL,STRUCT NAILING
|
BLD97-00615
| INSP - Letter of compliance | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - LC 8507
|
BLD97-00615
| INSP - Letter of compliance | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - LC 8507
|
BLD97-00148
| INSP - Framing/Rough-in | 3/21/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | A | FAIL |
|
|
03/24/97 340 - 316 AREA CN, OK TO INS. NEED ALL TRUSS CALCS
|
BLD97-00568
| INSP - Swimming pool | 3/21/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | A | PASS |
|
|
03/24/97 340 - POOL REBAR
|
BLD95-02164
| INSP - Foundation | 3/21/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | A | PART |
|
|
03/24/97 340 - FND. REBAR (SUMP AREA)...NW AERATION SUMP, BAR LOOKS OK
|
BLD96-02506
| INSP - Final | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | P | FAIL |
|
|
03/24/97 340 - C/N, 1HR WALL, AIR SEAL, STAIR
|
BLD96-03353
| INSP - Framing/Rough-in | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | P | FAIL |
|
|
03/24/97 340 - C/N, TRUSS BLKNG, HEAD OFF FLOOR AT FURN. OK TO INS
|
BLD96-03364
| INSP - Footings | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | P | PART |
|
|
03/24/97 340 - BSMT / RET & SIDE WALL FTGS, STEEL OK
|
BLD97-00615
| INSP - Final | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | P | PASS |
|
|
03/24/97 340 - ROOF, B.N.H.; COMPLETED, LOOKS OK
|
BLD97-00527
| INSP - Footings | 3/24/1997 | 3/24/1997 | 3/24/1997 12:00:00 AM | P | PART |
|
|
03/24/97 340 - NO PLAN, POURED
|