Inspections for the day of: Friday, March 24, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Tawney
TitleFIRE INSPECTOR
Phone #340-1295
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00355 FIRE-Sprinkler Rough-in3/23/20003/24/20003/24/2000 12:00:00 AMAPART
KEITH-- ###-#### R/I FIRE Conf. on AHU duct detectors 3/24/00 1:09:34 PM
BLD99-03704 FIRE-Final Inspection3/23/20003/24/20003/24/2000 12:00:00 AMAFAIL
jami ###-#### Reinsp. fail damper motor voltage not conect 3/24/00 1:09:15 PM
BLD98-01674 FIRE-Final Inspection3/23/20003/24/20003/24/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/23/2000 at 09:41:15. Contact: ###-####. Final fail C/N issued. 3/24/00 1:09:45 PM
BLD99-03569 FIRE-Final Inspection3/23/20003/24/20003/24/2000 12:00:00 AMPPASS
###-#### Final ok for perm. occ. 3/27/00 10:06:13 AM
BLD99-03568 FIRE-Final Inspection3/23/20003/24/20003/24/2000 12:00:00 AMPPASS
###-#### final ok for perm. occ 3/27/00 10:06:21 AM
FIR00-00083 INSP-Sprinkler Rough-in3/23/20003/24/20003/24/2000 12:00:00 AMPPART
around 1:00 if possible jim ###-#### Ok on installation of back flow preventer outside 3/27/00 10:06:52 AM
FIR00-00093 INSP-Final Inspection3/24/20003/24/20003/24/2000 12:00:00 AMPFAIL
mike ###-#### Final not ready for inspe. 3/27/00 10:06:34 AM
BLD99-02305 BLD-Final3/24/20003/24/20003/24/2000 12:00:00 AMPPASS
Ok for certificate of completion shell.
BLD99-02306 BLD-Final3/24/20003/24/20003/24/2000 12:00:00 AMPPASS
Ok for certificate of completion shell.