Inspections for the day of: Friday, March 24, 2000.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-00900 Rough-in3/23/20003/24/20003/24/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/23/2000 at 12:04:25. Contact: ###-####.
BLD00-00485 BLD-Foundation3/23/20003/24/20003/24/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/23/2000 at 12:13:40. Contact: ###-####. Poured before inspection, also still no soils report from engineer 3/24/00 1:13:20 PM
BLD99-02817 BLD-Final3/23/20003/24/20003/24/2000 12:00:00 AMAFAIL
Bill ###-#### Need mechanical, zoning, and firewall C/N 3/24/00 1:12:56 PM
BLD00-00366 BLD-Other3/23/20003/24/20003/24/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/23/2000 at 21:02:06. Contact: ###-####. OK shear 3/24/00 1:12:28 PM
BLD00-00373 BLD-Other3/23/20003/24/20003/24/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/23/2000 at 21:03:19. Contact: ###-####. Ok shear 3/24/00 1:12:24 PM
MEC00-00916 Final3/23/20003/24/20003/24/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/23/2000 at 14:40:07. Contact: ###-####.
BLD00-00155 BLD-Framing/Rough-in3/23/20003/24/20003/24/2000 12:00:00 AMPPART
###-#### Subject to electrical inspection, also noted window needs to be safety glazing. 3/27/00 4:19:29 PM
BLD99-03705 BLD-Energy code compliance3/23/20003/24/20003/24/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/23/2000 at 17:53:33. Contact: ###-####. Done by 316 3/27/00 4:21:11 PM
MEC00-00951 Rough-in3/24/20003/24/20003/24/2000 12:00:00 AMPPASS
###-####
MEC00-00951 Pressure Test3/24/20003/24/20003/24/2000 12:00:00 AMPPASS
BLD00-00698 BLD-Footing3/24/20003/24/20003/24/2000 12:00:00 AMPPASS
Dane ###-#### Footings 3/27/00 4:20:16 PM
BLD00-00384 BLD-Framing/Rough-in3/24/20003/24/20003/24/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/24/2000 at 10:23:14. Contact: ###-####. Collar ties at ceiling, deck/roof need the specifications for roof slope. 3/27/00 4:19:53 PM
BLD00-00725 BLD-Foundation3/24/20003/24/20003/24/2000 12:00:00 AMPPASS
###-#### Done by 316 3/27/00 4:21:02 PM
BLD00-00070 BLD-Framing/Rough-in3/23/20003/24/20003/24/2000 12:00:00 AMPFAIL
###-#### No approved plans 3/27/00 4:20:37 PM