ELE04-00786
| Rough-In Permanent Service | 3/23/2004 | 3/24/2004 | 3/24/2004 12:00:00 AM | A | PART |
|
|
###-####. Scheduled by a contractor via Hello! on 3/23/2004 at 11:57:59 AM. Contact: ###-####. 3/24/2004 7:39:22 AM
R/I Ok
install concrete encased electrode 3/24/2004 9:12:15 AM
|
ELE04-00808
| Permanent Service | 3/23/2004 | 3/24/2004 | 3/24/2004 12:00:00 AM | A | PART |
|
|
###-#### derek
requires 2nd ground rod.
water bonding is ok.
will change panel to junction box and run 4 wire to range.
P/S O/H R Ok to transfer power 3/24/2004 8:47:30 AM
|
ELE04-00175
| Final | 3/23/2004 | 3/24/2004 | 3/24/2004 12:00:00 AM | A | PASS |
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
ELE04-00410
| Final | 3/24/2004 | 3/24/2004 | 3/24/2004 12:00:00 AM | P | PASS |
|
|
darrell- ###-#### -also for detached gar
|
ELE04-00814
| Rough-In Permanent Service | 3/24/2004 | 3/24/2004 | 3/24/2004 12:00:00 AM | P | FAIL |
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
bond nipple between meter and panel.
concrete electrode required.
secure raceways at service within 3 ft.
arrange flex to recep under panel to drain.
bond water piping system. 3/24/2004 3:24:11 PM
|
ELE04-00091
| Electrical Rough-In | 3/24/2004 | 3/24/2004 | 3/24/2004 12:00:00 AM | P | PASS |
|
|
Charlie; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
large junction box in basement has ampacity rerate problem and grounding to be checked 3/24/2004 2:26:37 PM
|
ELE03-03799
| Permanent Service | 3/24/2004 | 3/24/2004 | 3/24/2004 12:00:00 AM | P | NR |
|
|
no service requested or permitted 3/24/2004 12:33:48 PM
|