FIR06-00116
| INSP-Final Inspection | 3/23/2006 | 3/24/2006 | 3/24/2006 3:17:26 PM | P | FAIL |
|
|
Sprinkler piping is ok to cover but can't final until the ceiling tile is installed.
|
BLD05-00235
| FIRE-Final Inspection | 3/24/2006 | 3/24/2006 | 3/24/2006 2:31:10 PM | P | PASS |
|
|
Life safety passed.
|
BLD04-00944
| FIRE-Final Inspection | 3/24/2006 | 3/24/2006 | 3/24/2006 12:36:40 PM | P | PASS |
|
|
Life safety finaled
|
FIR05-00842
| INSP-Final Inspection | 3/23/2006 | 3/24/2006 | 3/24/2006 11:44:22 AM | A | PART |
|
|
Fire sprinkler can be finaled when shell core is ready
|
FIR06-00113
| INSP-Final Inspection | 3/23/2006 | 3/24/2006 | 3/24/2006 9:58:23 AM | A | FAIL |
|
|
Need to install the all thread rod to the top of the red iron.
|
BLD05-03356
| FIRE-Final Inspection | 3/23/2006 | 3/24/2006 | 3/24/2006 9:57:55 AM | A | PART |
|
|
A temporary occupancy was given with dave hannimans permission until the all thread rod is taken to the top of the red iron. Life safety items are passed.
|
FIR06-00185
| INSP-Final Inspection | 3/23/2006 | 3/24/2006 | 3/24/2006 9:57:27 AM | A | PART |
|
|
A temporary occupancy was given with dave hannimans permission until the all thread rod is taken to the top of the red iron.
|