ELE08-00276
| Final | 3/24/2008 | 3/24/2008 | 3/24/2008 4:08:45 PM | P | PASS |
|
|
anill Phone #: ###-#### corrections made, ok to final
|
ELE07-01851
| Electrical Rough-In | 3/24/2008 | 3/24/2008 | 3/24/2008 3:43:13 PM | P | FAIL |
|
|
russ Phone #: ###-#### met owner, told BCC all make-up shall be done
|
ELE08-00604
| Electrical Rough-In | 3/24/2008 | 3/24/2008 | 3/24/2008 3:11:16 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: BRENDA HURST walls only ok to cover
|
ELE08-00417
| Electrical Rough-In | 3/24/2008 | 3/24/2008 | 3/24/2008 2:11:20 PM | P | PASS |
|
|
todd Phone #: ###-#### or ###-#### ric ok
|
ELE08-00669
| Electrical Rough-In | 3/21/2008 | 3/24/2008 | 3/24/2008 1:29:08 PM | P | PASS |
|
|
zane Phone #: ###-#### ric ok
|
ELE07-02082
| Electrical Rough-In | 3/24/2008 | 3/24/2008 | 3/24/2008 12:52:19 PM | P | FAIL |
|
|
steve Phone #: ###-#### met owner , corrections, NEC 210.52 outlet spacing shall be wothin 6' in wall space, 110.12(C) there shall be no broken boxes,BCC all make-up shall be done
|
ELE08-00679
| Conference | 3/21/2008 | 3/24/2008 | 3/24/2008 10:10:41 AM | A | DONE |
|
|
Gary ###-#### xt.3706 //please call for access info (already started work) talked about u/g inspection, 4-90degree bends, opening trench, no insulation at bored holes, grounding and circuits for garage
|
ELE08-00637
| Electrical Rough-In | 3/22/2008 | 3/24/2008 | 3/24/2008 9:55:21 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/22/2008 at 7:46:56 PM. Contact: ###-####. met owner, left correction notice, NEC 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing member. 312.5 shall close openings in boxes and use abrasion protection, 300.14 at least 6" free conductor shall be provided where conductor enters box then spliced, 210.52(A)(1) receptacles shall be installed such that no point along floor line is more than 6' from an outlet, 334.30 nm cable shall be secured at 4 1/2' intervals, 314.17 nm cable shall be secured within 8" of box BCC all make-up shall be done
|
ELE08-00675
| Electrical Rough-In | 3/20/2008 | 3/24/2008 | 3/24/2008 9:34:16 AM | A | FAIL |
|
|
kenneth Phone #: ###-#### called left correction notice, NEC 300.4(A)&(D) raceways shall be 1/14" from edge of framing members and bored holes, BCC raceways shall not be run in valley of 2x4 studs
|
ELE08-00679
| Electrical Rough-In | 3/21/2008 | 3/24/2008 | 3/24/2008 9:00:48 AM | A | FAIL |
|
|
Gary ###-#### xt. 3706//please call for access info met owner, BCC all u/g shall be inspected before cover, make-up shall be done, foam at header shall be removed for inspection
|
ELE08-00671
| Electrical Rough-In | 3/21/2008 | 3/24/2008 | 3/24/2008 8:07:33 AM | A | PASS |
|
|
Stratton and Assosiates corner 8th and Front bathroom addtion. Thank you Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa called contractor ri ok walls and hard lids
|