FIR09-00122
| INSP-Final Inspection | 3/23/2009 | 3/24/2009 | 3/24/2009 10:36:21 AM | A | FAIL |
|
|
Provide the new supervisory point on the existing graphic annuciator.
|
FIR08-00831
| INSP-Sprinkler Rough-in/Hydro | 3/23/2009 | 3/24/2009 | 3/24/2009 10:32:44 AM | A | PASS |
|
|
The rough-in piping for the second floor of building "B" is passed. A second inspection will be required for the insulation prior to cover.
|