ESC10-00177
| Site Preparation | 3/24/2010 | 3/24/2010 | 3/24/2010 5:29:22 PM | P | PASS |
|
|
OK
|
BLD10-00430
| BLD-Framing/Rough-in | 3/24/2010 | 3/24/2010 | 3/24/2010 5:28:56 PM | P | PASS |
|
|
andy Phone #: ###-####
|
BLD09-01683
| BLD-Foundation | 3/23/2010 | 3/24/2010 | 3/24/2010 5:28:37 PM | P | PART |
|
|
tim - pouring at 1:00 Phone #: ###-#### 80% complete. WIP on reinforcing. Special inspection required 3500 psi MTI planned inspection. Footings only.
|
ESC09-00611
| Site Preparation | 3/23/2010 | 3/24/2010 | 3/24/2010 2:06:16 PM | A | FAIL |
|
|
Talked to Zach (RP) Plan shows Concrete wash out pit location. No washout pit installed. C/N .....Do not pour any concrete without concrete washout pit installed.
|
BLD08-01975
| BLD-Final | 3/23/2010 | 3/24/2010 | 3/24/2010 11:28:38 AM | A | DONE |
|
|
EXP.
|
BLD08-01975
| DOC - Permit Expired | 3/24/2010 | 3/24/2010 | 3/24/2010 11:28:18 AM | P | PASS |
|
|
No return call No activity over 180 days.
|