PLM09-01103
| Final | 3/24/2010 | 3/24/2010 | 3/24/2010 4:38:16 PM | P | PASS |
|
|
corrections moved to a MIS permit
|
MIS10-00071
| PLM-Conference | 3/24/2010 | 3/24/2010 | 3/24/2010 4:01:59 PM | P | FAIL |
|
|
created this mis to track required cross connection control compliance. dropped off a correction notice at Perkins. corrections were originally addressed on a survey by United water and plumbing inspector from 7/14/09, associated with PLM09-01103. *CORRECNTION NOTICE* On 7/14/09 a cross connection survey was preformed at the above address with United Water. The following is a list of measures required to bring this building into compliance. Action must be taken with in 30 days. (1) watrer softener drain requires an air gap. (2) chemical station at the mop sink requires a seperate water supply. (3) R.P. required on the ice mechine upstream of the filter. (4) dish washer requires an R.P. (5) juicer requires a DCVA. (6) Hot Cocoa maker requires a DCVA (7) R.P. required on the water supply to the coffee maker, hot water dispensor and Ice tea maker. All the above is to be done by a licensed plumbing contractor, permitted and called in for inspection.
|
PLM10-00546
| Final | 3/24/2010 | 3/24/2010 | 3/24/2010 3:20:15 PM | P | PASS |
|
|
final ok
|
PLM10-00610
| Water and/or Sewer | 3/24/2010 | 3/24/2010 | 3/24/2010 1:28:12 PM | P | PASS |
|
|
Inspection requested from web by: Paul Lawson Phone #: ###-####
|
PLM10-00610
| Final | 3/24/2010 | 3/24/2010 | 3/24/2010 1:28:03 PM | P | PASS |
|
|
Inspection requested from web by: Paul Lawson Phone #: ###-#### just installed a two way cleanout by the willow in the front yard final ok
|
PLM10-00194
| Final | 3/24/2010 | 3/24/2010 | 3/24/2010 11:36:19 AM | P | PASS |
|
|
|
PLM08-02127
| Final | 3/23/2010 | 3/24/2010 | 3/24/2010 10:54:27 AM | A | PASS |
|
|
11:00ish
|
PLM09-01887
| Plumbing Rough-in | 3/24/2010 | 3/24/2010 | 3/24/2010 10:23:36 AM | A | PART |
|
|
talked about testing vent in production area
|
PLM10-00588
| Final | 3/24/2010 | 3/24/2010 | 3/24/2010 9:48:15 AM | A | PASS |
|
|
sewer ok water is stubbed under the house and plugged, needs united water to set meter vault and meter.
|
PLM10-00546
| Final | 3/23/2010 | 3/24/2010 | 3/24/2010 9:28:29 AM | A | FAIL |
|
|
Jim Phone #: ###-#### dcva requitred on the service. pipe water heater t&p in the restroom to floor drain area or exterior. thermol expansion?
|
PLM10-00607
| Sprinkler (Final) | 3/23/2010 | 3/24/2010 | 3/24/2010 9:16:00 AM | A | PART |
|
|
Backflow and main water connection Inspection requested from web by: Devon Wilson Phone #: ###-#### tie in ok just needs dcva tested
|
PLM10-00605
| Plumbing Rough-in | 3/23/2010 | 3/24/2010 | 3/24/2010 9:06:34 AM | A | PASS |
|
|
Tom Phone #: ###-#### ri gw ok
|
PLM09-01954
| Other | 3/24/2010 | 3/24/2010 | 3/24/2010 12:00:00 AM | P | PASS |
|
|
prior to final a recorded utility easement will need to be provided for this project.
|