Inspections for the day of: Wednesday, March 24, 2010.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM09-01103 Final3/24/20103/24/20103/24/2010 4:38:16 PMPPASS
corrections moved to a MIS permit
MIS10-00071 PLM-Conference3/24/20103/24/20103/24/2010 4:01:59 PMPFAIL
created this mis to track required cross connection control compliance. dropped off a correction notice at Perkins. corrections were originally addressed on a survey by United water and plumbing inspector from 7/14/09, associated with PLM09-01103.
*CORRECNTION NOTICE*
On 7/14/09 a cross connection survey was preformed at the above address with United Water. The following is a list of measures required to bring this building into compliance. Action must be taken with in 30 days. (1) watrer softener drain requires an air gap. (2) chemical station at the mop sink requires a seperate water supply. (3) R.P. required on the ice mechine upstream of the filter. (4) dish washer requires an R.P. (5) juicer requires a DCVA. (6) Hot Cocoa maker requires a DCVA (7) R.P. required on the water supply to the coffee maker, hot water dispensor and Ice tea maker. All the above is to be done by a licensed plumbing contractor, permitted and called in for inspection.
PLM10-00546 Final3/24/20103/24/20103/24/2010 3:20:15 PMPPASS
final ok
PLM10-00610 Water and/or Sewer3/24/20103/24/20103/24/2010 1:28:12 PMPPASS
Inspection requested from web by: Paul Lawson Phone #: ###-####
PLM10-00610 Final3/24/20103/24/20103/24/2010 1:28:03 PMPPASS
Inspection requested from web by: Paul Lawson Phone #: ###-#### just installed a two way cleanout by the willow in the front yard final ok
PLM10-00194 Final3/24/20103/24/20103/24/2010 11:36:19 AMPPASS
PLM08-02127 Final3/23/20103/24/20103/24/2010 10:54:27 AMAPASS
11:00ish
PLM09-01887 Plumbing Rough-in3/24/20103/24/20103/24/2010 10:23:36 AMAPART
talked about testing vent in production area
PLM10-00588 Final3/24/20103/24/20103/24/2010 9:48:15 AMAPASS
sewer ok water is stubbed under the house and plugged, needs united water to set meter vault and meter.
PLM10-00546 Final3/23/20103/24/20103/24/2010 9:28:29 AMAFAIL
Jim Phone #: ###-#### dcva requitred on the service. pipe water heater t&p in the restroom to floor drain area or exterior. thermol expansion?
PLM10-00607 Sprinkler (Final)3/23/20103/24/20103/24/2010 9:16:00 AMAPART
Backflow and main water connection Inspection requested from web by: Devon Wilson Phone #: ###-#### tie in ok just needs dcva tested
PLM10-00605 Plumbing Rough-in3/23/20103/24/20103/24/2010 9:06:34 AMAPASS
Tom Phone #: ###-#### ri gw ok
PLM09-01954 Other3/24/20103/24/20103/24/2010 12:00:00 AMPPASS
prior to final a recorded utility easement will need to be provided for this project.