Inspections for the day of: Thursday, March 24, 2011.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00202 INSP-Final Inspection3/24/20113/24/20113/25/2011 1:28:43 PMPNR
robert Phone #: ###-####
BLD10-02661 FIRE-Final Inspection3/24/20113/24/20113/24/2011 3:31:21 PMPFAIL
Missing premise identification, remove manual thumbturns at two locations including the main entry/exit.
FIR11-00009 INSP-Final Inspection3/23/20113/24/20113/24/2011 3:29:42 PMPPASS
Fire sprinkler permit finaled. Inspection passed.
FIR11-00036 INSP-Final Inspection3/23/20113/24/20113/24/2011 3:28:59 PMPPASS
Fire sprinkler work passed inspection, permit finaled.
FIR10-00523 INSP-Final Inspection3/23/20113/24/20113/24/2011 3:28:10 PMANR
Forrest/Troy, They want to do a temp occupancy on the Showroom side of the original building. The only part of the fire alarm install not complete is the (2) duct detectors. They have not changed out the HVAC units yet, so the duct detectors are not operational. Please call me and let me know if this will work. Thanks, Jason ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
FIR10-00538 INSP-Final Inspection3/23/20113/24/20113/24/2011 3:27:50 PMPPASS
Field verified adjustments, inspection passed. Permit finaled.
FIR10-00579 INSP-Final Inspection3/23/20113/24/20113/24/2011 12:39:19 PMAFAIL
Final pending forward flow test sufficient to meet system demand, reliable heating at the riser room to maintain ambient temperature above 40 deg., signage at the doors to the riser. Alarm interconnections tested okay.
FIR10-00656 INSP-Final Inspection3/23/20113/24/20113/24/2011 12:32:40 PMAFAIL
Final pending correct length sample tube at duct detectors 2 and 3, RTU 1 is not powered at this time, provide cover plate at riser room junction box, label spare FPL at the panel and the riser room, provide locks at the panel circut breaker. Points map and door signage posted while on site. Sprinkler monitoring, FACP, AES and offsite signals okayed.
FIR11-00117 INSP-Sprinkler Rough-in/Hydro3/23/20113/24/20113/24/2011 12:26:58 PMAPART
Overhead fire sprinkler modifications at the new drop ceilings are okay for cover. Note: two intermediate temp concealed heads as marked on plans will need to be provided with 165 deg. escutcheons per submital.
BLD10-00842 FIRE-Final Inspection3/23/20113/24/20113/24/2011 12:22:20 PMAPASS
Fire life safety final approved.
FIR10-00415 INSP-Final Inspection3/22/20113/24/20113/24/2011 12:21:18 PMAPASS
Corrections finished. Fire alarm passed final inspection.
FIR10-00470 INSP-Sprinkler Rough-in/Hydro3/23/20113/24/20113/24/2011 12:00:00 AMAPASS
Passed hydro.
Steph Phone #: ###-####
FIR10-00514 INSP-Sprinkler Rough-in3/23/20113/24/20113/24/2011 12:00:00 AMAPASS
Passed one sprinkler in riser room as a rough in.

Steph Phone #: ###-####