Inspections for the day of: Tuesday, March 24, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00277 INSP-Final Inspection3/23/20153/24/20153/25/2015 5:09:07 PMPPASS
UG fire supply line permit final approved.
BLD15-00350 FIRE-Final Inspection3/24/20153/24/20153/24/2015 2:06:24 PMPPASS
Fire life safety inspection completed satisfactory.
FIR15-00167 INSP-Final Inspection3/24/20153/24/20153/24/2015 2:05:25 PMPPASS
Fire sprinkler permit final approved.
FIR15-00167 INSP-Sprinkler Rough-in3/24/20153/24/20153/24/2015 2:03:46 PMPPASS
Fire sprinkler permit work okay for final after mixed temp heads replaced with matched while on site.
FIR14-00437 INSP-Sprinkler Rough-in/Hydro3/23/20153/24/20153/24/2015 12:41:57 PMAPART
Completed satisfactory hydrostatic test of the new dry system piping.
FIR14-00867 INSP-Sprinkler Rough-in/Hydro3/23/20153/24/20153/24/2015 12:39:41 PMAPART
Completed overhead inspection for both the first and second floor systems. Rough-in passed.
FIR15-00087 INSP-Final Inspection3/23/20153/24/20153/24/2015 10:54:30 AMAPART
Inspection for overhead rough-in completed at the grid ceiling areas. Need to relocate one new pendent head at the NW corner office.
BLD14-03402 FIRE-Final Inspection3/23/20153/24/20153/24/2015 10:38:54 AMAPASS
Verified noted correction items for completion. Life safety passed.