Inspections for the day of: Tuesday, March 24, 2015.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00759 General Inspection3/23/20153/24/20153/25/2015 10:51:39 AMPPASS
Work on roof and interior is occuring. Hillside silt fence perimeter is in good condition and no dirt has been stockpiled up against it so there is also a vegetative barrier. Trash is contained, no significant trackout from site.

No work or repairs to hillside with erosion on adajacent site. Stakes in the ground, so it is being looked at.
ESC13-00193 General Inspection3/24/20153/24/20153/25/2015 9:31:06 AM PASS
ESC14-00774 General Inspection3/24/20153/24/20153/24/2015 4:26:51 PM CANC
rescheduled
ESC14-00873 Aging Inspection3/24/20153/24/20153/24/2015 4:15:06 PM PASS
Work complete, all permits finaled. ESC permit conditiions satisifed.
ESC14-00873 DOC - Permit Finaled3/24/20153/24/20153/24/2015 4:13:52 PMPPASS
ESC12-00403 General Inspection3/24/20153/24/20153/24/2015 4:13:00 PM CANC
rescheduled
ESC14-00797 General Inspection3/24/20153/24/20153/24/2015 4:11:03 PM CANC
rescheduled
ESC14-00725 General Inspection3/24/20153/24/20153/24/2015 4:06:49 PM PASS
WIP. No sediment trackout or runoff from construction area. Downslope wattle is installed. Trash contained. Approved.
ESC14-00783 Aging Inspection3/24/20153/24/20153/24/2015 4:01:01 PM PASS
Demolition work has not started. No issues at site.
ESC14-00144 General Inspection3/24/20153/24/20153/24/2015 3:53:22 PM PASS
East Valley sub in good condition. Tahoe Homes building SFHs under seperate permits. Roads, gutters, and sidewalks are free of loose sediment. No trackout from open areas, no hillside erosion observed, lined concrete washout provided.

No corrections at this time.
ESC14-00909 Aging Inspection3/24/20153/24/20153/24/2015 3:47:39 PM PASS
BLD finaled but lot not yet landscaped, stabilized, and final site cleanup. No trackout or discharges, need stabilization.
ESC15-00213 Site Preparation3/24/20153/24/20153/24/2015 3:39:51 PMPPASS
Clint Phone #: ###-####

First new SFH in Dallas Harris phase #12. Lined washout pit located on block of development. DIs have coir mat sediment protection; permit posted.

Requested that workers be forbidden to exit off unfinished portion of Wolf Tree to reduce/prevent track out to Old Hickory

Approved for construction
ESC14-00157 General Inspection3/24/20153/24/20153/24/2015 3:25:12 PM PASS
Near completion. Yard was just landscaped/stabilized. Need to do final sidewalk and driveway sweep up to final permit. BLD still open. No issues or dirty runoff.
ESC15-00203 Site Preparation3/24/20153/24/20153/24/2015 3:11:48 PMPPASS
Brett Phone #: ###-####

Approved for construction. Lined washout provided, Dunham Commons inlets have sediment protection. RP Brett stated they will continue to sweep up footprint trackout from muddy/wet conditions.
ESC14-00740 Aging Inspection3/24/20153/24/20153/24/2015 11:02:13 AM PASS
TI complete. Materials removed/cleaned. ESC conditions satisfied.
ESC14-00740 DOC - Permit Finaled3/24/20153/24/20153/24/2015 11:00:47 AMPPASS
ESC14-00932 Random Inspection3/24/20153/24/20153/24/2015 10:39:31 AMAPASS
Work on new parking lot has resumed. Perimeter wattles, construction entrance and permit are onsite. No discharges or trackout to Gowen or Supply. No corrections needed.
ESC14-00762 Aging Inspection3/24/20153/24/20153/24/2015 10:16:05 AM PASS
No earth disturbance. Work on Dennis Dillon exterior facade in progress. No polluted runoff or trackout from site.
ESC14-00791 General Inspection3/24/20153/24/20153/24/2015 10:14:18 AM PASS
WIP. Hangar walls have been erected. Construction entrance is getting some mud due to recent rains, but no significant trackout to Gowen Road. Area of disturbance is 14 acres located within large open south runway area. No dust or other issues.
ESC14-00777 General Inspection3/24/20153/24/20153/24/2015 10:06:25 AM PASS
Warehouse addition near complete as well as new curbing. Landscaping and placement of irrigation lines is in progress. No trackout or muddy runoff. Approved.