Inspections for the day of: Tuesday, March 25, 1997.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE97-00853 INSP - Permanent service3/25/19973/25/19973/25/1997 12:00:00 AM FAIL
/ / 315 - 53 failed jf cor. posted NEC, T250-94 #4 to electrode and wa 250-80 shall remove #6 bond wire from sub panels,to water system, 110-14 use noalox on all alluminum connections, 250-92(b) use connector to pass through at service pan
ELE97-00902 INSP - Ele Rough-In/Perm Svc3/24/19973/25/19973/25/1997 12:00:00 AMAPASS
03/25/97 315 - 09&53 ok jf 8rms 1a/c 200a u/g new
ELE97-00903 INSP - Ele Rough-In/Perm Svc3/24/19973/25/19973/25/1997 12:00:00 AMAPASS
03/25/97 315 - 09&53 ok jf 10rms 1a/c 200a u/g new
ELE97-00904 INSP - T/S and Final3/25/19973/25/19973/25/1997 12:00:00 AMAPASS
ELE96-03771 INSP - Ele Rough-In/Perm Svc3/24/19973/25/19973/25/1997 12:00:00 AMACANC
03/25/97 315 - PLEASE TALK TO DON WHEN YOU GET THERE cancel see added
ELE97-00348 INSP - Final3/20/19973/25/19973/25/1997 12:00:00 AMAPASS
03/25/97 315 - late a.m. as close to noon as possible 14 ok jf
ELE97-00489 INSP - Final3/24/19973/25/19973/25/1997 12:00:00 AMACANC
03/25/97 315 - canceled by contractor jf
ELE97-00853 INSP - Permanent service3/24/19973/25/19973/25/1997 12:00:00 AMACANC
03/25/97 315 - need to check with JSchmer on 53 jf
ELE97-00715 INSP - Final3/25/19973/25/19973/25/1997 12:00:00 AMPPASS
03/25/97 315 - STE 125 14 ok jf
ELE97-00135 INSP - Final3/25/19973/25/19973/25/1997 12:00:00 AMPPASS
03/25/97 315 - 14 ok jf