PLM02-00741
| Plumbing Rough-in | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | | CANC |
|
|
DAVE ###-####
|
PLM02-00607
| Plumbing Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 13:54:19. Contact: ###-####.
|
PLM02-00272
| Final | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | NH |
|
|
gene - ###-#### fn--for gar code access use the add reading backwards no access to main part of house 3/25/2002 1:38:20 PM
|
PLM02-00271
| Final | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PASS |
|
|
gene ###-####--if locked gar code is add reading backwards
|
PLM02-00726
| Sprinkler (Final) | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 3/22/2002 5:35:30 PM
|
PLM02-00741
| Groundwork | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 3/25/2002 12:42:29 PM
|
PLM02-00738
| Sprinkler (Final) | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PART |
|
|
for common area -russ ###-#### need approved material for piping from control valves to backflow device backflow device need,s to be tested and certified called contractor will recall when ready 3/25/2002 2:25:54 PM
|
PLM02-00354
| Final | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/25/2002 at 08:15:42. Contact: ###-####.
|
PLM02-00218
| Final | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PART |
|
|
BOB ###-#### need to provide for thermal expansion need to provide protective cover,s for handdicapp lav water and waste drain called Bob plumbing contractor will recall when ready 3/25/2002 5:06:09 PM
|
PLM01-03592
| Med/Gas Systems | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/25/2002 at 08:38:12. Contact: ###-####. N.F.P.A. 99-C 4-5.4.1.3 need system verification and final testing report on level-3 compressed air and vacuum system 3/25/2002 4:05:49 PM
|