Inspections for the day of: Monday, March 25, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02802 BLD-Framing/Rough-in3/22/20023/25/20023/26/2002 12:00:00 AMAPART
Scheduled by Inspector: 407 On 3/22/2002 2:06:36 PM
BLD02-00060 BLD-Framing/Rough-in3/22/20023/25/20023/25/2002 12:00:00 AMAPASS
###-#### GILL . Ok after electrical inspection. 3/25/2002 11:05:04 AM
BLD01-01054 BLD-Energy code compliance3/22/20023/25/20023/25/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 03/22/2002 at 17:10:20. Contact: ###-####.
BLD02-00603 BLD-Concrete3/21/20023/25/20023/25/2002 12:00:00 AMAPART
###-#### Wayne POOL. Rebar ok. no ground wire seen at this time 3/25/2002 11:17:59 AM
BLD02-00497 BLD-Framing/Rough-in3/22/20023/25/20023/25/2002 12:00:00 AMAPART
###-#### STEVE footing not framing. 3/25/2002 11:27:23 AM
BLD02-00124 BLD-Framing/Rough-in3/22/20023/25/20023/25/2002 12:00:00 AMAPART
###-#### tie down inspection for temporary premanufactured structure. Appears ok no details called out on approved plans. 3/25/2002 12:24:52 PM
BLD01-01054 BLD-Final3/22/20023/25/20023/25/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/22/2002 at 17:12:25. Contact: ###-####.needs all signatures and s-i final letter. PM 3/25/2002 4:46:44 PM
BLD02-00257 BLD-Framing/Rough-in3/25/20023/25/20023/25/2002 12:00:00 AMPFAIL
###-#### ERNIE c/n posted. 3/25/2002 3:37:03 PM
BLD01-01309 BLD-Final3/25/20023/25/20023/25/2002 12:00:00 AMPPASS
DAVID ###-####