BLD01-02802
| BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/26/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 3/22/2002 2:06:36 PM
|
BLD02-00060
| BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PASS |
|
|
###-#### GILL . Ok after electrical inspection. 3/25/2002 11:05:04 AM
|
BLD01-01054
| BLD-Energy code compliance | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 17:10:20. Contact: ###-####.
|
BLD02-00603
| BLD-Concrete | 3/21/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PART |
|
|
###-#### Wayne POOL. Rebar ok. no ground wire seen at this time 3/25/2002 11:17:59 AM
|
BLD02-00497
| BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PART |
|
|
###-#### STEVE footing not framing. 3/25/2002 11:27:23 AM
|
BLD02-00124
| BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PART |
|
|
###-#### tie down inspection for temporary premanufactured structure. Appears ok no details called out on approved plans. 3/25/2002 12:24:52 PM
|
BLD01-01054
| BLD-Final | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 17:12:25. Contact: ###-####.needs all signatures and s-i final letter. PM 3/25/2002 4:46:44 PM
|
BLD02-00257
| BLD-Framing/Rough-in | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | FAIL |
|
|
###-#### ERNIE c/n posted. 3/25/2002 3:37:03 PM
|
BLD01-01309
| BLD-Final | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PASS |
|
|
DAVID ###-####
|